Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall With Concertina Wire Of Police Lines, Bhiwani.
|
Description |
Construction Of Boundary Wall With Concertina Wire Of Police Lines, Bhiwani.
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2024_HBC_404765_1 |
Reference Number |
20245A9C3DB8 2D92 46B3 AC29 6F9C3389690957HHC |
Tender Fee | 16180 |
EMD | 5.14 Lakh |
Tender Value | |
Place | Bhiwani |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=481208 |
Start Date | October 18, 2024 18:30 |
End Date |
28/10/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreConstruction of 220/132 kv, 1x160 mva and 132/33 kv, 1x40/50 mva gss betina jaisalmer with cap bank bay incl. survey, supply of all equipment/materials, erection (incl civil), testing and commissioning (turnkey project) against rvpn/ehv/bn9019002502
Construction of 220/132 kv, 1x160 mva and 132/33 kv, 1x40/50 mva gss betina jaisalmer with cap bank bay incl. survey, supply of all equipment/materials, erection (incl civil), testing and commissioning (turnkey project) against rvpn/ehv/bn9019002502
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 132 kv ehv lines under tlm sub dn. itarsi under administrative control of ee (eht-maint.) dn. itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 132 kv ehv lines under tlm sub dn. itarsi under administrative control of ee (eht-maint.) dn. itarsi
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.4
Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&#x0d &#x0d &#x0d
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConstruction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Read moreof your Industry type