Tender Details

Particulars Details
Title
Mtc Of Road From Nh 08 Near Pecharthal Petrol Pump To Pecharthal Railway Station Via Laxman Cherra High School From Ch 0 Point 10 Km To 1 Point 00 Km Under Pwd R And B Pencharthal Sub Division During The Year 2023 24 Sh Pot Holes Repairs Carpeting
Description
Mtc Of Road From Nh 08 Near Pecharthal Petrol Pump To Pecharthal Railway Station Via Laxman Cherra High School From Ch 0 Point 10 Km To 1 Point 00 Km Under Pwd R And B Pencharthal Sub Division During The Year 2023 24 Sh Pot Holes Repairs Carpeting
Organisation Government of Tripura
Tender Id 2023_CEPWD_39121_1
Reference
Number
24/EE/KD/2023-24
Tender Fee 1000
EMD 29878
Tender Value
Place Executive Engineer Kumarghat division PWD R and B
Link https://tripuratenders.gov.in
Start Date June 07, 2023 22:45
End Date

28/06/2023 ( Expired 740 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Fdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.

Fdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.

Read more
Mtc of road from jirania block complex near old ps to mandwi road via vidyasagar colony during the year 2025-26 sh patch metalling, grouting, patch carpeting and other allied works. (l 2.10 km, ch.0.00 km to ch.2.10 km).

Mtc of road from jirania block complex near old ps to mandwi road via vidyasagar colony during the year 2025-26 sh patch metalling, grouting, patch carpeting and other allied works. (l 2.10 km, ch.0.00 km to ch.2.10 km).

Read more
Mtc. of pmgsy road from shibsankar para to asta jungal under jirania sub division pwd (r and b) during the year 2025-2026 sh grouting, metalling patch carpetting, seal coat, etc. (l 1.97 km, from ch.0.00 mtr to ch.1970.00 mtr).

Mtc. of pmgsy road from shibsankar para to asta jungal under jirania sub division pwd (r and b) during the year 2025-2026 sh grouting, metalling patch carpetting, seal coat, etc. (l 1.97 km, from ch.0.00 mtr to ch.1970.00 mtr).

Read more
Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)

Fdr mtc. of road from old agartala-chandrapur road to bro bypass road via west champamura tribal basti (l 2.70 km) under khayerpur pwd(r and b) sub-division during the year 2025-26 sh construction of 01 (one) no rcc boxcell (3.00 x 3.00 mtr)

Read more
Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.

Fdr mtc. of road from ranirgaon (karaibon) to jarulbachai via bagbari, babaniapara (l 9.56 km) under khayerpur pwd(r and b) sub division during the year 2025-26 sh construction of 01 (one) no rcc box cell (4.00 x 4.00 mtr) at ch. 8.25 km.

Read more
Mtc of road from jirania market (aa road) to mandwi road via dushmanta narayan para (l 1.77 km) during the year 2025-26 sh patch metalling, grouting, re-carpeting, road side pucca drain and other allied works. (l 1.00 km, ch.0.00 km to ch.1.00 km)

Mtc of road from jirania market (aa road) to mandwi road via dushmanta narayan para (l 1.77 km) during the year 2025-26 sh patch metalling, grouting, re-carpeting, road side pucca drain and other allied works. (l 1.00 km, ch.0.00 km to ch.1.00 km)

Read more
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Read more
Mtc. of road from nh-08 (guramara bridge) to kali nagar via durga nagar (pmgsy) sh construction of one box culvert (4.00 mtr x 4.00 mtr) along with demarcation of the road by providing rcc pillar during the year 2025-26.

Mtc. of road from nh-08 (guramara bridge) to kali nagar via durga nagar (pmgsy) sh construction of one box culvert (4.00 mtr x 4.00 mtr) along with demarcation of the road by providing rcc pillar during the year 2025-26.

Read more
Improvement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)

Improvement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)

Read more
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise