Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of High Level Bridge Across Thirumanimutharu River At Km 0/8 Of Elupuli Elayampalayam Road In Lieu Of Existing Causeway
|
| Description |
Construction Of High Level Bridge Across Thirumanimutharu River At Km 0/8 Of Elupuli Elayampalayam Road In Lieu Of Existing Causeway
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_HWAY_380095_1 |
|
Reference Number |
TN.No.09 /2023-2024 / SDO/ Dated.10.10.2023 |
| Tender Fee | 0 |
| EMD | 1.9 Lakh |
| Tender Value | |
| Place | Salem |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | October 18, 2023 00:00 |
| End Date |
Expired
02/11/2023
Expired 977 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreKasargod development package_bakkilapadavu bridge_kasaragod devolopment package_construction of bakilapadavu bridge across shiriya nalka kandige river in kasaragod district_general civil work
Kasargod development package_bakkilapadavu bridge_kasaragod devolopment package_construction of bakilapadavu bridge across shiriya nalka kandige river in kasaragod district_general civil work
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreof your Industry type