Tender Details

Particulars Details
Title
Construction Of Grey Water Management Project At Atiabari Ii
Description
Construction Of&Amp#X0d Grey Water&Amp#X0d Management&Amp#X0d Project At&Amp#X0d Atiabari Ii
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2024_ZPHD_701479_1
Reference
Number
NIT09 GNGP 2024-25
Tender Fee 500
EMD 18300
Tender Value -
Place GOBRACHHARA NAYARHAT GP,KARALA,COOCHBEHAR
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1529801

Start Date June 27, 2024 23:30
End Date
Expired 06/07/2024

Expired 813 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for sale of mig houses at ganga nagar project

Tender for sale of mig houses at ganga nagar project

Read more
Construction of commercial complex building at rapcms ltd yard in mandya

Construction of commercial complex building at rapcms ltd yard in mandya

Read more
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district

Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district

Read more
Construction of additional class rooms to mini gurukulam at mamda (v) of mamda (m) in nirmal district

Construction of additional class rooms to mini gurukulam at mamda (v) of mamda (m) in nirmal district

Read more
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Read more
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.

Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise