Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Road From Damcherra Khedacherra Road To Uttamjoy Para Via Tabjirai Para At Ch.1.20 Km L S Under Damcherra Sub Division, Pwd R And B During The Year 2025 2026 Sh Patchmetalling, Carpeting. Seal Coating,Rcc Retaining Wall, Wbm 3, Pavers
|
Description |
Maintenance Of Road From Damcherra Khedacherra Road To Uttamjoy Para Via Tabjirai Para At Ch.1.20 Km L S Under Damcherra Sub Division, Pwd R And B During The Year 2025 2026 Sh Patchmetalling, Carpeting. Seal Coating,Rcc Retaining Wall, Wbm 3, Pavers
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_60398_1 |
Reference Number |
37/EE/KCP/2025-26. |
Tender Fee | 1000 |
EMD | 48450 |
Tender Value | |
Place | Damcherra |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=61428 |
Start Date | April 17, 2025 00:00 |
End Date |
23/04/2025 ( Expired 47 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreMaintenance of road from mill chowmuhani to railbridge road via adjacent roads under pwd (rnb) kakraban sub-division/ sh protection work, earth filling, turfing,road marking etc with allied works during the year 2025-26
Maintenance of road from mill chowmuhani to railbridge road via adjacent roads under pwd (rnb) kakraban sub-division/ sh protection work, earth filling, turfing,road marking etc with allied works during the year 2025-26
Read moreMtc of road anandabazar -tahshil kachari road and food godown at ananda bazar (l-0.250 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, recarpeting, seal coat and pucca drain etc.
Mtc of road anandabazar -tahshil kachari road and food godown at ananda bazar (l-0.250 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, recarpeting, seal coat and pucca drain etc.
Read moreMtc of road from kambaltilla bazar to bagan para (l 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, patch recarpeting, seal coat etc portion from ch 0.00km to ch 1.50 km.
Mtc of road from kambaltilla bazar to bagan para (l 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, patch recarpeting, seal coat etc portion from ch 0.00km to ch 1.50 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Read moreUrgent replacement of damaged slab culvert on the adibasighat - brikshathal road at ch. 0.600km under dasda sub-division, pwd(rnb) during the year 2025-26/ sh dismentling of existing culvert, rcc box cell (3.00 m x 3.00 m) and pucca drain etc.
Urgent replacement of damaged slab culvert on the adibasighat - brikshathal road at ch. 0.600km under dasda sub-division, pwd(rnb) during the year 2025-26/ sh dismentling of existing culvert, rcc box cell (3.00 m x 3.00 m) and pucca drain etc.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Read moreof your Industry type