Tender Details

Particulars Details
Title
Custom Bid For Services Machining Of Bottom Die,Custom Bid For Services Machining Of Top Die
Description
Organisation Department of Defence Research & Development | Ministry of Defence
Tender Id GEM/2024/B/4452807
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date January 19, 2024 22:05
End Date
Expired 09/02/2024

Expired 977 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: Yes
Ministry: Ministry Of Defence
Department: Department Of Defence Research & Development
Organisation: Office Of Dg ( Ns & M)

Technical Evaluation Results

S.No. Seller Name Participated On EMD Status MSE/MII Status Status
1 FINEX DIES PRIVATE LIMITED 15-02-2024 18:29:40 Registered with designated Agency / Authority MSE Evaluated
2 NRC AEROSPACE INDIA PRIVATE LIMITED 09-02-2024 09:53:35 Registered with designated Agency / Authority MSE Evaluated
3 TECHMATE ENGINEERS 08-02-2024 22:57:04 Registered with designated Agency / Authority MSE Evaluated
Similar Tenders
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Read more
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Read more
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system

Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system

Read more
Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot

Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot

Read more
Roof top rain water harvesting work for type-3 houses in chitrakoot district

Roof top rain water harvesting work for type-3 houses in chitrakoot district

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg

Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg

Read more
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027

Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise