Tender Details
Particulars | Details |
---|---|
Title |
Complete Dismantling Of Defunct Magnetic Separators From Conveyors 2 And 3 And Transporting It To The Specified Location /Store, Transportation Of New Magnetic Separators From The Store To The Site Of Installation Along With Installation, Erection, S
|
Description |
Complete Dismantling Of Defunct Magnetic Separators From Conveyors 2 And 3 And Transporting It To The Specified Location /Store, Transportation Of New Magnetic Separators From The Store To The Site Of Installation Along With Installation, Erection, S
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_325287_1 |
Reference Number |
NCL/JNT/EandM/Tender/24-25/575 |
Tender Fee | 0 |
EMD | 3600 |
Tender Value | |
Place | CHP Jayant Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337190 |
Start Date | January 10, 2025 14:30 |
End Date |
21/01/2025 ( Expired 139 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreSupply, fabrication and installation of ss equipment, structural members along with ss304l piping from building 401 to 503 of frfcf project
Supply, fabrication and installation of ss equipment, structural members along with ss304l piping from building 401 to 503 of frfcf project
Read moreHiring of 2no of explosive vans(1no.10tonne capacity van for transportaion of explosives(ld) and 1no.3 tonne capacity van for transportation off detonators and other accessories from kothagudem area stores to jkoc project yellandu area with 12 hour availability per day and 2000km per month for a period of 3 years -reg
Hiring of 2no of explosive vans(1no.10tonne capacity van for transportaion of explosives(ld) and 1no.3 tonne capacity van for transportation off detonators and other accessories from kothagudem area stores to jkoc project yellandu area with 12 hour availability per day and 2000km per month for a period of 3 years.
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreExtention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion
Extention / diversion 
 of 3.3 kv overhead line at 
 ocp of akwmc.(2) diversion 
 of 3.3 kv feeder to provide 
 power to 7 seam to new 
 location due to new 
 bench 
 exposed 
 at 
 akwmc,katras area-iv.(3) 
 dismantling and diversion
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreNctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Nctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Read moreAmrut 2 urgent rectification of sewerage network by replacement of damaged 150 mm sw pipes with 200mm sw pipe and 250mm sw pipe construction of new manholes from kunnunbanglow to mudavanmughal jn near rc church ,trivandrum under sewerage section ii
Amrut 2 urgent rectification of sewerage network by replacement of damaged 150 mm sw pipes with 200mm sw pipe and 250mm sw pipe construction of new manholes from kunnunbanglow to mudavanmughal jn near rc church ,trivandrum under sewerage section ii
Read moreEchp-ii- cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure along with the conveyors from 48a b to 68
Echp-ii- cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure along with the conveyors from 48a b to 68
Read moreDrilling, excavation, transportation, supply of limestone from 630ha new umrangso limestone mines of amdcl as mdo along with setting up of integrated green field manufacturing plant of cement and value-added products within assam
Drilling, excavation, transportation supply&#x0d of limestone from 630ha new umrangso limestone mines of amdcl&#x0d as mdo along with setting up of integrated&#x0d green field manufacturing plant of cement&#x0d and value-added products within assam
Read moreof your Industry type