Tender Details
Particulars | Details |
---|---|
Title |
Additional Work I.E. Illumination, Railings, Bus Bay Etc Along Guwahati Bypass
|
Description |
Additional Work I.E. Illumination, Railings, Bus Bay Etc Along Guwahati Bypass
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_213798_1 |
Reference Number |
NHAI/RO/GHY/2024/LIGHT |
Tender Fee | 50000 |
EMD | 29.53 Lakh |
Tender Value | |
Place | NHAI RO GHY |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=235816 |
Start Date | November 08, 2024 18:30 |
End Date |
26/12/2024 ( Expired 141 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Area illumination infrastructure work from lallu singh chawk to new bus stand in municipal council shahdol
Area illumination infrastructure work from lallu singh chawk to new bus stand in municipal council shahdol
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreNit for complete erection work of construction of 01 no. 132kv and 01 no. 33kv feeder bay along with transformer foundation for add. 50mva transformer at bhander 132kv substation under testing division ii gwalior
Nit for complete erection work of construction of 01 no. 132kv and 01 no. 33kv feeder bay along with transformer foundation for add. 50mva transformer at bhander 132kv substation under testing division ii gwalior
Read moreWork of strenghthening of existing 220 kv and 132 kv main bus along with supply of material and associated works at 220 kv sub station banda under etd banda.
Work of strenghthening of existing 220 kv and 132 kv main bus along with supply of material and associated works at 220 kv sub station banda under etd banda.
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreConstruction of remain cement concrete road, footpath, storm water line etc work from gangwal bus stand to silawatpura in ward no. 68, 69 under zone no. 02
Construction of remain cement concrete road, footpath, storm water line etc work from gangwal bus stand to silawatpura in ward no. 68, 69 under zone no. 02
Read moreRepairs to steel and iron work such as railings chain link fencing meshing covering of drains etc
Repairs to steel and iron work such as railings chain link fencing meshing covering of drains etc
Read moreFor the work of construction of lt/ 11 kv line for releasing new connections and additional load and line/pole shifting etc. work under the jurisdiction of electricity urban distribution division-ii, moradabad (in deposit scheme).
For the work of construction of lt/ 11 kv line for releasing new connections and additional load and line/pole shifting etc. work under the jurisdiction of electricity urban distribution division-ii, moradabad (in deposit scheme).
Read moreThird party techno financial audit of the work of construction of retaining wall along with drain on 80 feet wide road for disposal of rain water and special repair of roads in sector 66 b, it city (near village rurka), sas nagar etc.
Third party techno financial audit of the work of construction of retaining wall along with drain on 80 feet wide road for disposal of rain water and special repair of roads in sector 66 b, it city (near village rurka), sas nagar etc.
Read moreof your Industry type