Tender Details
Particulars | Details |
---|---|
Title |
Interception And Diversion Work For Tapping Nallah And Setup Sewage Treatment Plant For Used Water Management For Khaniyadana Town
|
Description |
Interception And Diversion Work For Tapping Nallah And Setup Sewage Treatment Plant For Used Water Management For Khaniyadana Town
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16534 |
EMD | 1.92 Lakh |
Tender Value | |
Place | MC KHANIYADHANA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 10, 2025 16:00 |
End Date |
26/05/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Sitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreOperation and maintenance of solid waste management plant for the processing msw with aerobic composting
Operation and maintenance of solid waste management plant for the processing msw with aerobic composting
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Read moreDesisgning, providing, constructing, installation, commissioning and erecting 50 kld capacity sewage treatment plant based on tiger bio filter technology at. zp building, ratnagiri. block and district ratnagiri.
Desisgning, providing, constructing, installation, commissioning and erecting 50 kld capacity sewage treatment plant based on tiger bio filter technology at. zp building, ratnagiri. block and district ratnagiri.
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreComplete operation maintenance, upkeepment in/c watch and ward surface water treatment plant at masli under dws sub-division manu
Complete operation maintenance, upkeepment in/c watch and ward surface water treatment plant at masli under dws sub-division manu
Read moreof your Industry type