Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚤 Procurement Opportunity: Automatic Boat Charging System 🔋 The Department Of Atomic Energy, Under The Prime Minister's Office, Is Seeking Proposals For The Design, Manufacturing, Supply, Testing, And Inspection Of An Automatic Boat Charging System, Inclusive Of Mandatory Spare Parts. 🗓️ Submission Deadline: April 13, 2024, 2:00 Pm Proposals Should Encompass A Comprehensive Approach To The System's Design, Manufacturing, And Operational Efficiency, With A Focus On Reliability And Durability. Keywords: Automatic Boat Charging System, Design, Manufacturing, Supply, Testing & Inspection, Department Of Atomic Energy, Pmo, Government Tender| Particulars | Details |
|---|---|
| Title |
Design, Mfg, Supply, Testing&Inspection Of Automatic Boat Charging System With Mandatory Spares
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2024/B/4814322 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 23, 2024 21:09 |
| End Date |
Expired
13/04/2024
Expired 914 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
073-fv-0072,mandatory spares of 073-fv-0072,073-fv-0201,mandatory spares of 073-fv-0201,073-fv-0202,mandatory spares of 073-fv-0202,073-fv-0203,mandatory spares of 073-fv-0203,073-fv-0204,mandatory spares of 073-fv-0204,073-fv-0205,mandatory spares of 073-fv-0205,073-fv-0218,mandatory spares of 073-fv-0218,073-fv-0219,mandatory spares of 073-fv-0219,073-fv-0220,mandatory spares of 073-fv-0220,073-hv-0118,mandatory spares of 073-hv-0118,073-hv-0129,mandatory spares of 073-hv-0129,073-lv-0125a,mandatory spares of 073-lv-0125a,073-lv-0125b,mandatory spares of 073-lv-0125b,073-lv-0127,mandatory spares of 073-lv-0127,073-pv-0119,mandatory spares of 073-pv-0119,073-pv-0467,mandatory spares of 073-pv-0467,073-pv-0480,mandatory spares of 073-pv-0480,073-pv-0498a,mandatory spares of 073-pv-0498a,073-tv-0172,mandatory spares of 073-tv-0172,073-tv-0175,mandatory spares of 073-tv-0175,073-xv-0190,mandatory spares of 073-xv-0190,site supervision for tag no. 073-hv-0129
073-fv-0072,mandatory spares of 073-fv-0072,073-fv-0201,mandatory spares of 073-fv-0201,073-fv-0202,mandatory spares of 073-fv-0202,073-fv-0203,mandatory spares of 073-fv-0203,073-fv-0204,mandatory spares of 073-fv-0204,073-fv-0205,mandatory spares of 073-fv-0205,073-fv-0218,mandatory spares of 073-fv-0218,073-fv-0219,mandatory spares of 073-fv-0219,073-fv-0220,mandatory spares of 073-fv-0220,073-hv-0118,mandatory spares of 073-hv-0118,073-hv-0129,mandatory spares of 073-hv-0129,073-lv-0125a,mandatory spares of 073-lv-0125a,073-lv-0125b,mandatory spares of 073-lv-0125b,073-lv-0127,mandatory spares of 073-lv-0127,073-pv-0119,mandatory spares of 073-pv-0119,073-pv-0467,mandatory spares of 073-pv-0467,073-pv-0480,mandatory spares of 073-pv-0480,073-pv-0498a,mandatory spares of 073-pv-0498a,073-tv-0172,mandatory spares of 073-tv-0172,073-tv-0175,mandatory spares of 073-tv-0175,073-xv-0190,mandatory spares of 073-xv-0190,site supervision for tag no. 073-hv-0129
Read moreComplete control valve with accessories along with mandatory spares
Complete control valve with accessories along with mandatory spares
Read moreComputer controlled versatile automatic inspection system
Computer controlled versatile automatic inspection system
Read moreDesign supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system
Design supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system
Read moreU-hc-201a, complete control valve with mandatory spares detail specification as per attached annexur,u-pcv-203, complete control valve with mandatory spares detail specification as per attached annexu,u-tcv-501, complete control valve with mandatory spares detail specification as per attached annex-a,u-pcv-502, complete control valve with mandatory spares detail specification as per attached annex-a
U-hc-201a, complete control valve with mandatory spares detail specification as per attached annexur,u-pcv-203, complete control valve with mandatory spares detail specification as per attached annexu,u-tcv-501, complete control valve with mandatory spares detail specification as per attached annex-a,u-pcv-502, complete control valve with mandatory spares detail specification as per attached annex-a
Read moreTggenco - nshes - design, manufacture, testing at manufactures works, inspection, packing, supply and delivery of 82.5 kva, 415v, 3-phase diesel generator set along with automatic main failure(amf) panel board at nshes, nagarjunasagar.
Tggenco - nshes - design, manufacture, testing at manufactures works, inspection, packing, supply and delivery of 82.5 kva, 415v, 3-phase diesel generator set along with automatic main failure(amf) panel board at nshes, nagarjunasagar.
Read moreTggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply of acsr moose conductor at nshes, nagarjuna sagar.
Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply of acsr moose conductor at nshes, nagarjuna sagar.
Read moreDesign, manufacturing, testing, supply, installation, commissioning of rb doors for ghavp-1and2 along with supply of spares.
Design, manufacturing, testing, supply, installation, commissioning of rb doors for ghavp-1and2 along with supply of spares.
Read moreVt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial
Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial
Read moreDesign, engineering, manufacture, testing at manufacture works & supply of 220 kv sf6 circuit breake,erection, testing & commissioning, charging, and training to uprvunl persons about the working of 22
Design, engineering, manufacture, testing at manufacture works & supply of 220 kv sf6 circuit breake,erection, testing & commissioning, charging, and training to uprvunl persons about the working of 22
Read moreof your Industry type