Tender Details

About Tender

🚤 Procurement Opportunity: Automatic Boat Charging System 🔋 The Department Of Atomic Energy, Under The Prime Minister's Office, Is Seeking Proposals For The Design, Manufacturing, Supply, Testing, And Inspection Of An Automatic Boat Charging System, Inclusive Of Mandatory Spare Parts. 🗓️ Submission Deadline: April 13, 2024, 2:00 Pm Proposals Should Encompass A Comprehensive Approach To The System's Design, Manufacturing, And Operational Efficiency, With A Focus On Reliability And Durability. Keywords: Automatic Boat Charging System, Design, Manufacturing, Supply, Testing & Inspection, Department Of Atomic Energy, Pmo, Government Tender
Particulars Details
Title
Design, Mfg, Supply, Testing&Inspection Of Automatic Boat Charging System With Mandatory Spares
Description
Organisation Department of Atomic Energy | PMO
Tender Id GEM/2024/B/4814322
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date March 23, 2024 21:09
End Date
Expired 13/04/2024

Expired 914 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Puttagumpala Vijaya Sekhar
Ministry: Pmo
Department: Department Of Atomic Energy
Organisation: Directorate Of Purchase And Stores
Similar Tenders
073-fv-0072,mandatory spares of 073-fv-0072,073-fv-0201,mandatory spares of 073-fv-0201,073-fv-0202,mandatory spares of 073-fv-0202,073-fv-0203,mandatory spares of 073-fv-0203,073-fv-0204,mandatory spares of 073-fv-0204,073-fv-0205,mandatory spares of 073-fv-0205,073-fv-0218,mandatory spares of 073-fv-0218,073-fv-0219,mandatory spares of 073-fv-0219,073-fv-0220,mandatory spares of 073-fv-0220,073-hv-0118,mandatory spares of 073-hv-0118,073-hv-0129,mandatory spares of 073-hv-0129,073-lv-0125a,mandatory spares of 073-lv-0125a,073-lv-0125b,mandatory spares of 073-lv-0125b,073-lv-0127,mandatory spares of 073-lv-0127,073-pv-0119,mandatory spares of 073-pv-0119,073-pv-0467,mandatory spares of 073-pv-0467,073-pv-0480,mandatory spares of 073-pv-0480,073-pv-0498a,mandatory spares of 073-pv-0498a,073-tv-0172,mandatory spares of 073-tv-0172,073-tv-0175,mandatory spares of 073-tv-0175,073-xv-0190,mandatory spares of 073-xv-0190,site supervision for tag no. 073-hv-0129

073-fv-0072,mandatory spares of 073-fv-0072,073-fv-0201,mandatory spares of 073-fv-0201,073-fv-0202,mandatory spares of 073-fv-0202,073-fv-0203,mandatory spares of 073-fv-0203,073-fv-0204,mandatory spares of 073-fv-0204,073-fv-0205,mandatory spares of 073-fv-0205,073-fv-0218,mandatory spares of 073-fv-0218,073-fv-0219,mandatory spares of 073-fv-0219,073-fv-0220,mandatory spares of 073-fv-0220,073-hv-0118,mandatory spares of 073-hv-0118,073-hv-0129,mandatory spares of 073-hv-0129,073-lv-0125a,mandatory spares of 073-lv-0125a,073-lv-0125b,mandatory spares of 073-lv-0125b,073-lv-0127,mandatory spares of 073-lv-0127,073-pv-0119,mandatory spares of 073-pv-0119,073-pv-0467,mandatory spares of 073-pv-0467,073-pv-0480,mandatory spares of 073-pv-0480,073-pv-0498a,mandatory spares of 073-pv-0498a,073-tv-0172,mandatory spares of 073-tv-0172,073-tv-0175,mandatory spares of 073-tv-0175,073-xv-0190,mandatory spares of 073-xv-0190,site supervision for tag no. 073-hv-0129

Read more
Complete control valve with accessories along with mandatory spares

Complete control valve with accessories along with mandatory spares

Read more
Computer controlled versatile automatic inspection system

Computer controlled versatile automatic inspection system

Read more
Design supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system

Design supply erection installation testing and commissioning of automatic milk pouches stacking collating and conveying system

Read more
U-hc-201a, complete control valve with mandatory spares detail specification as per attached annexur,u-pcv-203, complete control valve with mandatory spares detail specification as per attached annexu,u-tcv-501, complete control valve with mandatory spares detail specification as per attached annex-a,u-pcv-502, complete control valve with mandatory spares detail specification as per attached annex-a

U-hc-201a, complete control valve with mandatory spares detail specification as per attached annexur,u-pcv-203, complete control valve with mandatory spares detail specification as per attached annexu,u-tcv-501, complete control valve with mandatory spares detail specification as per attached annex-a,u-pcv-502, complete control valve with mandatory spares detail specification as per attached annex-a

Read more
Tggenco - nshes - design, manufacture, testing at manufactures works, inspection, packing, supply and delivery of 82.5 kva, 415v, 3-phase diesel generator set along with automatic main failure(amf) panel board at nshes, nagarjunasagar.

Tggenco - nshes - design, manufacture, testing at manufactures works, inspection, packing, supply and delivery of 82.5 kva, 415v, 3-phase diesel generator set along with automatic main failure(amf) panel board at nshes, nagarjunasagar.

Read more
Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply of acsr moose conductor at nshes, nagarjuna sagar.

Tggenco - nshes - design, manufacture, testing at manufacturers works, inspection, packing, supply of acsr moose conductor at nshes, nagarjuna sagar.

Read more
Design, manufacturing, testing, supply, installation, commissioning of rb doors for ghavp-1and2 along with supply of spares.

Design, manufacturing, testing, supply, installation, commissioning of rb doors for ghavp-1and2 along with supply of spares.

Read more
Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial

Vt pump bowl assembly,suspension assembly with line shaft, bearings,,4-pole, ie3 vertical motor complete,discharge head, sole-base plate, coupling,complete automatic star-delta control,power-control cables, glands, lugs,special erection tools, mandatory spares,third-party inspection and factory performance,packing, freight, transit insurance, unloading,erection, installation, alignment, testing, 8-hour trial

Read more
Design, engineering, manufacture, testing at manufacture works & supply of 220 kv sf6 circuit breake,erection, testing & commissioning, charging, and training to uprvunl persons about the working of 22

Design, engineering, manufacture, testing at manufacture works & supply of 220 kv sf6 circuit breake,erection, testing & commissioning, charging, and training to uprvunl persons about the working of 22

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise