Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Slab Drain ( Cd Work) On Road Savli To Savli Tanda Vr 140 Km 1/00 To 2/00 Tal Dhule Dist Dhule
|
Description |
Construction Of Slab Drain ( Cd Work) On Road Savli To Savli Tanda Vr 140 Km 1/00 To 2/00 Tal Dhule Dist Dhule
|
Organisation | RDD-CEO-DHULE | State Govt. and UT |
Tender Id | 2025_DHULE_1141229_1 |
Reference Number |
GP SAVALI TANDA /04/2024-25 |
Tender Fee | 500 |
EMD | 0 |
Tender Value | |
Place | Savali Tal dist Dhule |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1987673 |
Start Date | January 23, 2025 22:30 |
End Date |
30/01/2025 ( Expired 111 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreConstruction of both side cc drain work shree ram vatika ti jail road at ward no 14. municipal council ambah dist morena
Construction of both side cc drain work shree ram vatika ti jail road at ward no 14. municipal council ambah dist morena
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of 38337m long span bridge over chainth khad at km 2400 on link road bassi to sarkaghat under pmgsy3 batchi package no hp03171 a
Construction of 38337m long span bridge over chainth khad at km 2400 on link road bassi to sarkaghat under pmgsy3 batchi package no hp03171 a
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreConstruction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Read moreUnder district ayodhya, construction of road from ahiran purwa (bahras) south to tanda sufi marg ,lot no 1
Under district ayodhya, construction of road from ahiran purwa (bahras) south to tanda sufi marg ,lot no 1&#x0d
Read moreof your Industry type