Tender Details
Particulars | Details |
---|---|
Title |
E Tender For Propsed Construction Of Rcc Fire Ugr Of 1.0 Lac Litre Capacity Supply And Installation Of Over Head Pvc Tank Of 20000 Litre Capacity Including Construction Of Pump Room And Other Allied Works At Divisional Office Ajmer
|
Description |
E Tender For Propsed Construction Of Rcc Fire Ugr Of 1.0 Lac Litre Capacity Supply And Installation Of Over Head Pvc Tank Of 20000 Litre Capacity Including Construction Of Pump Room And Other Allied Works At Divisional Office Ajmer
|
Organisation | Life Insurance Corporation of India | Central Govt. Ministry/Department |
Tender Id | 2024_LIC_777298_1 |
Reference Number |
LIC/NZ/ENGG/494 |
Tender Fee | 590 |
EMD | 76000 |
Tender Value | |
Place | Ajmer |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1081298 |
Start Date | November 05, 2024 23:00 |
End Date |
19/11/2024 ( Expired 176 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Read moreInternal, external electrification works for structural plant, compound, office room, weigh bridge room, security room, pump panel and supply installation of pump motor for proposed 200 tpd municipal fresh waste processing plant under swm project
Internal, external electrification works for structural plant, compound, office room, weigh bridge room, security room, pump panel and supply installation of pump motor for proposed 200 tpd municipal fresh waste processing plant under swm project
Read moreRepair / replacement of lt ug cable / lt outdoor panels main to e/m installation / substation, mccb and connected works and repair / maintenance of fire fighting systems, fire panels / equipment, smoke detectors with allied services at hqtc bangalore
Repair / replacement of lt ug cable / lt outdoor panels main to e/m installation / substation, mccb and connected works and repair / maintenance of fire fighting systems, fire panels / equipment, smoke detectors with allied services at hqtc bangalore
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of ups.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of ups.
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of fire detection system.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of fire detection system.
Read moreConstruction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Construction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Read moreSrcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority
Srcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of ac machines.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of ac machines.
Read moreConstruction of 20000 lire capacity over head tank at ward no 8 golden street
Construction of 20000 lire capacity over head tank at ward no 8 golden street
Read moreRebuild- phase-1-wss to neduvathoor panchayat and kottarakkara municipality-construction and commissioning of 9 m dia. intake well cum pump house, transformer room, ramp and allied works.
Rebuild- phase-1-wss to neduvathoor panchayat and kottarakkara municipality-construction and commissioning of 9 m dia. intake well cum pump house, transformer room, ramp and allied works.
Read moreof your Industry type