Construction Works For Di Of 400k V Qmdc Line From Telangana Stpp (Ntpc)(2x800 Mw) To 400/220/132k V Narsapur Ss Between Loc. No. 292 To 293 Length Of 0.5kms Approx.
|
| Description |
Construction Works For Di Of 400k V Qmdc Line From Telangana Stpp(ntpc)(2 X800 Mw) To 400/220/132k V Narsapur Ss Between Loc.No.292 To 293 Length Of 0.5k Ms (Approx.) For Carrying Out The Bg Track Laying Work By M/S. South Central Railways Between Siddipet And Siricilla Section On Turnkey Basis
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 591029 |
|
Reference Number |
e-EHVT-01/2025-26 |
| Tender Fee | 11800 |
| EMD | 10.96 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 22, 2025 23:15 |
| End Date |
Expired
02/05/2025
Expired 530 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
I) replacement of single tension hardware with double tension hardware between loc no.14(r3) and 15 (c6) of 132kv narsapur (400kv)-gummadidala iii line. ii)supply of caution boards for above 132kv line towers iii) supply of circuit name boards for 400kv narsapur-shankarpally and gajwel line.
I) replacement of single tension hardware with double tension hardware between loc no.14(r3) and 15 (c6) of 132kv narsapur (400kv)-gummadidala i and ii line. ii)supply of caution boards for above 132kv line towers iii) supply of circuit name boards for 400kv narsapur-shankarpally and gajwel line.
Read moreI) replacement of single tension hardware with double tension hardware between loc no 14 (r13) and 15 (c6) of 132kv narsapur (400kv)-gummadidala i and ii line. ii)supply of caution boards for above 132kv line towers. iii) supply of circuit name boards for 400kv narsapur-shankarpally and gajwel line.
I) replacement of single tension hardware with double tension hardware between loc no 14 (r13) and 15 (c6) of 132kv narsapur (400kv)-gummadidala i and ii line. ii)supply of caution boards for above 132kv line towers.iii) supply of circuit name boards for 400kv narsapur-shankarpally and gajwel line.
Read moreProviding of vibration dampers at missing locations of 132kv minpur-medak line in onm division, 400kv narsapur(general/open)
Providing of vibration dampers at missing locations of 132kv minpur-medak line in onm division,400kv narsapur(general/open)
Read moreProviding of vibration dampers at missing locations of 132kv minpur-medak line in om division, 400kv narsapur(earmarked for st)
Providing of vibration dampers at missing locations of 132kv minpur-medak line in onm division, 400kv narsapur(earmarked for st)
Read moreStrengthening of earthing of 220kv and 132kv ptrs at 220/132/33kv minpur ss by providing earth pits in om division, 400kv narsapur
Strengthening of earthing of 220kv and 132kv ptrs at 220/132/33kv minpur ss by providing earth pits in om division, 400kv narsapur
Read moreSupply, erection, testing and commissioning of upgradation of existing 132kv ss chinnashankarampet to 220kv ss, 220kv dc line from 400kv ss narsapur to chinnashankarampet, 2nd circuit stringing on 132kv line from medak to ramayampet and making lilo to chinnashenkarampet along with 2nos 220kv bays at narsapur 400kv ss, 1no 132kv bay at medak ss and 1no 132kv bay at ramayampet ss in sangareddy district on turnkey basis
Supply, erection, testing and commissioning of existing 132kv ss chinnashenkarampet to 220kv ss, 220kv dc line from 400kv ss narsapur, 2nd circuit stringing on 132kv dc/sc line from medak-ramayampet and making lilo to 220kv ss chinnashenkarampet along with 2nos 220kv bays at narsapur 400kv ss, 1no 132kv bay at medak 132kv ss and 1no 132kv bay at ramayampet 132kv ss in sanagreddy disctrict on turnkey basis.
Read moreProviding of additional tower earthing of 91 no.s towers in 132kv minpur-narayankhed line/132kv minpur-peddashankarampet peddashankarampet-narayankhed line in lines sub division minpur in om division 400kv narsapur in sangareddy circle
Providing of additional tower earthing of 91 no.s towers in 132kv minpur-narayankhed line/132kv minpur-peddashankarampet peddashankarampet-narayankhed line in lines sub division minpur in om division 400kv narsapur in sangareddy circle
Read moreReplacement of old exisitng tracking prone problematic 160kn src insulators with new 160kn src insulators to avoid frequent flashovers and trippings due to salinity and pollution in 400kv kptm tpp to sembcorp and 400kv kptm tpp to manubolu qmdc lines at cut points loc nos 1,2 gantry
Replacement of old existing tracking prone problematic 160kn src insulators with new 160 kn src insulators to avoid frequent flashovers and trippings due to salinity and pollution in 400kv krishnapatnam tpp to semb-corp and 400kv krishnapatnam tpp to manubolu quad moose lines at cut points loc no 1,2 gantry.
Read moreReplacement of old exisitng tracking prone problematic 160kn src insulators with new 160kn src insulators to avoid frequent flashovers and trippings due to salinity and pollution in 400kv kptm tpp to sembcorp and 400kv kptm tpp to manubolu qmdc lines at cut points loc nos 1,2 gantry
Replacement of old existing tracking prone problematic 160kn src insulators with new 160 kn src insulators to avoid frequent flashovers and trippings due to salinity and pollution in 400kv krishnapatnam tpp to semb-corp and 400kv krishnapatnam tpp to manubolu quad moose lines at cut points loc no 1,2 gantry.
Read more400kv ais new substation package ss98t for (a) construction of 400/220/132kv amarpatan s/s, b) extension of 132kv amarpatan(mpptcl) s/s, c) extension of 132kv satna-ii s/s, d) extension of 132kv rampur-baghelan s/s and e) extension of 132kv unchehra s/s associated with development of intra-state transmission system for evacuation of 1230mw power (mppmcl portion) through stu network from proposed 2x800mw thermal power project of m/s mahan energen ltd. (mel) through tbcb route
400kv ais new substation package ss98t for (a) construction of 400/220/132kv amarpatan s/s, b) extension of 132kv amarpatan(mpptcl) s/s, c) extension of 132kv satna-ii s/s, d) extension of 132kv rampur-baghelan s/s and e) extension of 132kv unchehra s/s associated with development of intra-state transmission system for evacuation of 1230mw power (mppmcl portion) through stu network from proposed 2x800mw thermal power project of m/s mahan energen ltd. (mel) through tbcb route
Read moreof your Industry type