Tender Details
Particulars | Details |
---|---|
Title |
Realignment Of 1 Km Long 12.75 Inch Od Pajpl From Pajpl Ch.49.000 50.000 Km Across Humkhad Nala Through Single Hdd Methodology
|
Description |
Realignment Of 1 Km Long 12.75 Inch Od Pajpl From Pajpl Ch.49.000 50.000 Km Across Humkhad Nala Through Single Hdd 
Methodology
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2024_NRPNP_182088_1 |
Reference Number |
PNP24082 |
Tender Fee | 0 |
EMD | 2.05 Lakh |
Tender Value | |
Place | As per tender document |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=192312 |
Start Date | November 25, 2024 20:30 |
End Date |
06/12/2024 ( Expired 137 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying of 4 inch id di water supply line to overcome the problem of low pressure from house no.1285 to 1296 1 sector 30-b chd. under the charge of sde mcph sub division no.16 chandigarh. ch. to revenue head.
Providing and laying of 4 inch id di water supply line to overcome the problem of low pressure from house no.1285 to 1296 1 sector 30-b chd. under the charge of sde mcph sub division no.16 chandigarh. ch. to revenue head.
Read moreConstruction of 4l of patna arrah sasaram corridor pkg2 sec 1 garhani at ch. km 73.700 patar at ch. km 84.300 and sec 2 greenfield from sadisopur at patna ring rd nh131g) ch. km 0.000 to asani (at nh319) at ch km 35.800 of nh119a in bihar on ham mode
Construction of 4l of patna arrah sasaram corridor pkg2 sec 1 garhani at ch. km 73.700 patar at ch. km 84.300 and sec 2 greenfield from sadisopur at patna ring rd nh131g) ch. km 0.000 to asani (at nh319) at ch km 35.800 of nh119a in bihar on ham mode
Read moreDevelopment of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Development of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Read moreEngagement of user fee agency on the basis of cb through e-tender for jagtara fp at km 94.995 for two/four lane with paved shoulders section for the use of dhamtari-kanker section from design ch. 81.500 to km 129.912 of nh 43 in chhattisgarh
Engagement of user fee agency on the basis of cb through e-tender for jagtara fp at km 94.995 for two/four lane with paved shoulders section for the use of dhamtari-kanker section from design ch. 81.500 to km 129.912 of nh 43 in chhattisgarh
Read moreSix laning of panipat-khanna section of nh-1 from km. 96.000 to km. 272.000 in the state of haryana and punjab. - undertaking rectification works through bc overlay and microsurfacing at various locations along the project highway.
Six laning of panipat-khanna section of nh-1 from km. 96.000 to km. 272.000 in the state of haryana and punjab. - undertaking rectification works through bc overlay and microsurfacing at various locations along the project highway.
Read moreWidening from single lane to intermediate lane and improvements at km 1/6 - 5/8 of mettukadai - moothampalayam road including widening of curves, junction improvements at km 1/6, 3/4, 5/8 and dip rising at km 1/8 and construction of retaining wall at
Widening from single lane to intermediate lane and improvements at km 1/6 - 5/8 of mettukadai - moothampalayam road including widening of curves, junction improvements at km 1/6, 3/4, 5/8 and dip rising at km 1/8 and construction of retaining wall at
Read moreConstruction of steel bridge single span 58 m long over bml canal crossing ropar to purkhali via majri jattan fathepur bhangala road in km 1 including its approaches retaining walls and footpath in district rupnagar
Construction of steel bridge single span 58 m long over bml canal crossing ropar to purkhali via majri jattan fathepur bhangala road in km 1 including its approaches retaining walls and footpath in district rupnagar
Read moreWidening from single lane to two lane and improvements at km 1 0 2 0 3 0 4 0 7 0 7 2 widening from intermediate lane to two lane and improvements at km 7 2 9 0 of nagalapuram melakaranthai masarpatti rajapatti road
Widening from single lane to two lane and improvements at km 1 0 2 0 3 0 4 0 7 0 7 2 widening from intermediate lane to two lane and improvements at km 7 2 9 0 of nagalapuram melakaranthai masarpatti rajapatti road
Read moreTransportation and loading and unloading of approx 4500m of 12.75 inch od, pipes from muzaffarpur storage yard to munger storage yard.
Transportation and loading and unloading of approx 4500m of 12.75 inch od, pipes from muzaffarpur storage yard to munger storage yard.
Read moreConst of 6 cell box culvert at sangiam side to discharge extraordinary flood to the main work of const of hlb across thenpennaiyar at km 1/5 of road branching from thagadi thiyagadurgam manalurpet road connecting thiru-manalur road at pillayarpalayam
Const of 6 cell box culvert at sangiam side to discharge extraordinary flood to the main work of const of hlb across thenpennaiyar at km 1/5 of road branching from thagadi thiyagadurgam manalurpet road connecting thiru-manalur road at pillayarpalayam
Read moreof your Industry type