Particulars Details
Title
Realignment Of 8.625 Inch Od Guwahati Siliguri Pipeline (Gspl) Across Beki River At Ch. 119.7 Km By Micro Tunnelling Method And Associated Works
Description
Realignment Of 8.625 Inch Od Guwahati Siliguri Pipeline (Gspl) Across Beki River At Ch. 119.7 Km By Micro Tunnelling Method And Associated Works
Organisation IndianOil Corporation Limited(IOCL)
Tender Id 2023_PLHO_171647_1
Reference
Number
PLCC/GSPL Beki-MicroTunnel/CL/23087
Tender Fee
EMD 11.43 Lakh
Tender Value
Place PLHO Noida
Link https://iocletenders.nic.in
Start Date November 03, 2023 20:00
End Date

09/11/2023 ( Expired 530 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Work of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl

Work of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl

Read more
Ofc laying /t-066/ karnal and kurukshetra oa (part of karnal ba)

E-tender for laying plb pipe/ duct and associated works by open trench method/trenchless technology, optical fibre cable pulling/blowing and splicing works etc., for 4g ferberization ,rehabilitation work in karnal an kurukshetra oa part of karnal ba

Read more
Excavation of sand from karegoan

Excavation of sand by manual method for 64,424 mt from karegaon sand reach at nizamabad district in manjeera river at karegaon village of pothangal mandal, nizamabad district and loading of sand into the lorries at sand reach and transport same quantity of sand to nearby stockyard (bidder has to identify stock yard near to motorable road) and again loading of sand into the lorries at stockyard.

Read more
Repair and maintenance for prion of leakage of barbotya flume channel along with other associated works at sidrapong hydel project under mini micro hydel division, kurseong, dist, darjeeling

Repair and maintenance for prion of leakage of barbotya flume channel along with other associated works at sidrapong hydel project under mini micro hydel division, kurseong, dist, darjeeling

Read more
Work of development of 24x7 wss in ward 2 of nishat area by way of sdltc of separate pipe network including all work of mech, elec., scada, household connections, consumer water meter fitting--- and associated e-m and civil works at harwan (sarband)

Work of development of 24x7 wss in ward 2 of nishat area by way of sdltc of separate pipe network including all work of mech, elec., scada, household connections, consumer water meter fitting--- and associated e-m and civil works at harwan (sarband)

Read more
Rehabilitation work of underground ofc of tripura ba

Rehabilitation work of underground ofc, including laying of plb pipe or duct and associated works including searching of pits by open trench method or trenchless technology optical fibre cable pulling or blowing and splicing works jointing chamber

Read more
Construction of part-1 works on 635 ha in the commannd area of chandi river project by conventional method and in deep cutting areas through closed pipeline and handing over to water user association.

Construction of part-1 works on 635 ha in the commannd area of chandi river project by conventional method and in deep cutting areas through closed pipeline and handing over to water user association.

Read more
Construction of part-1 works on 556 ha in the commannd area of chandi river project by conventional method and in deep cutting areas through closed pipeline and handing over to water user association.

Construction of part-1 works on 556 ha in the commannd area of chandi river project by conventional method and in deep cutting areas through closed pipeline and handing over to water user association.

Read more
Construction of part-1 works on 675 ha in the commannd area of chandi river project by conventional method and in deep cutting areas through closed pipeline and handing over to water user association.

Construction of part-1 works on 675 ha in the commannd area of chandi river project by conventional method and in deep cutting areas through closed pipeline and handing over to water user association.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise