Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cutting Earth And Filling The Cracks Due To Subsidence Above The Cm Panel 16 El At Shyamsundarpur Colliery
|
| Description |
Cutting Earth And Filling The Cracks Due To Subsidence Above The Cm Panel 16 El At Shyamsundarpur Colliery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_284863_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/23-24/Min/74 Dt 01.08.2023 |
| Tender Fee | - |
| EMD | 2000 |
| Tender Value | - |
| Place | ONLINE |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 02, 2023 21:30 |
| End Date |
Expired
12/08/2023
Expired 1163 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreCutting earth and filling the cracks due to subsidence above cm panel 6c and 5c in rvi seam at s.s.pur colliery
Cutting earth and filling the cracks due to subsidence above cm panel 6c and 5c in rvi seam at s.s.pur colliery
Read moreFilling of subsidence area near magazine earth filling and earth filling of subside area near kalimati incline under chapapur colliery.
Filling of subsidence area near magazine earth filling and earth filling of subside area near kalimati incline under chapapur colliery.
Read moreRenovation of old drain around subsidence area at surface of shyamsundarpur colliery
Renovation of old drain around subsidence area at surface of shyamsundarpur colliery
Read moreFilling of subsidence are with carried earth near kaharpara of new kenda colliery under kenda area
Filling of subsidence are with carried earth near kaharpara of new kenda colliery under kenda area
Read moreRenovation of old drain around subsidence area at surface of shyamsundarpur colliery (retender)
Renovation of old drain around subsidence area at surface of shyamsundarpur colliery (retender)
Read moreEarth cutting and filling pot hale over the subsidence jc17 central sector area rviii sean of bankola colliery.
Earth cutting and filling pot hale over the subsidence jc17 central sector area rviii sean of bankola colliery.
Read moreEarth cutting and filling of pot hole at subsidence at jc9 caving panel of no. 1incline of bankola colliery
Earth cutting and filling of pot hole at subsidence at jc9 caving panel of no. 1incline of bankola colliery
Read moreProtection work such as earth cutting and filling of the same in cracks around the subsidence areas over the different depillaring panels at pali colliery of pali sub area of johilla area
Protection work such as earth cutting and filling of the same in cracks around the subsidence areas over the different depillaring panels at pali colliery of pali sub area of johilla area
Read moreof your Industry type