Tender Details
Particulars | Details |
---|---|
Title |
Providing, Erection, Testing And Commissioning Of 1000 Kva Rating, 3 Phase, 50 Hz, 33/0.433 Kv, Conventional Copper Wound Distribution Transformer At First Stage Of New Ramjanki Pump Canal
|
Description |
Providing, Erection, Testing And Commissioning Of 1000 Kva Rating, 3 Phase, 50 Hz, 33/0.433 Kv, Conventional Copper Wound Distribution Transformer At First Stage Of New Ramjanki Pump Canal
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2025_UPIDM_1002819_1 |
Reference Number |
13/Lot1/MLCDBanda/204-25 |
Tender Fee | 854 |
EMD | 55000 |
Tender Value | |
Place | Kamasin Banda |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1790053 |
Start Date | February 06, 2025 23:30 |
End Date |
13/02/2025 ( Expired 66 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, and commissioning of two 1000 kva three-phase outdoor distribution transformers, along with ht/lt cable laying, excavation work, construction of transformer plinth, and other associated works at vnit campus, nagpur
Supply, installation, testing, and commissioning of two 1000 kva three-phase outdoor distribution transformers, along with ht/lt cable laying, excavation work, construction of transformer plinth, and other associated works at vnit campus, nagpur
Read moreProcurement of 100 nos., isi marked, 11/0.433 kv, three phase, 500 kva, 50 cycles, outdoor type, oil immersed, crgo/amorphous core, copper wound dts
Procurement of 100 nos., isi marked, 11/0.433 kv, three phase, 500 kva, 50 cycles, outdoor type, oil immersed, crgo/amorphous core, copper wound dts
Read moreDesign supply erection testing and commissioning of 25 kv 50 hz single phase conventional type overhead equipment sub sectioning and paralleling post retractable rigid catenary system and rigid over head conductor system of wcl sasti
Design supply erection testing and commissioning of 25 kv 50 hz single phase conventional type overhead equipment sub sectioning and paralleling post retractable rigid catenary system and rigid over head conductor system of wcl sasti
Read moreDesign, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss
Design, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss p
Read moreDesign, manufacture, supply, erection, testing and commissioning of 160 kva distribution transformers after dismantling the existing transformer or in the new location, at different locations under electrical circle, alappuzha on turnkey basis
Design, manufacture, supply, erection, testing and commissioning of 160 kva distribution transformers after dismantling the existing transformer or in the new location, at different locations under electrical circle, alappuzha on turnkey basis
Read moreDetails of materials and its specification for the work of supplying, installation, commissioning and testing of horizontal split casing centrifugal pump having discharge 150000 gph at total head of 36 meters and 250 kva 11 0.433 kv transformer w
Details of materials and its specification for the work of supplying, installation, commissioning and testing of horizontal split casing centrifugal pump having discharge 150000 gph at total head of 36 meters and 250 kva 11 0.433 kv transformer w
Read moreProviding, erecting and commissioning of 33 kv/3.3 kv 1600 kva hermetically sealed transformer with satisfactory test and trial at new jaykwadi pump house.
Providing, erecting and commissioning of 33 kv/3.3 kv 1600 kva hermetically sealed transformer with satisfactory test and trial at new jaykwadi pump house.
Read moreEmpanelment of erection contractors to award a contract for survey, installation, testing and commissioning of 11 kv line, ,11/0.433 kv distribution transformer and lt line under different schemes in the (onm) circle dindori
Empanelment of erection contractors to award a contract for survey, installation, testing and commissioning of 11 kv line, ,11/0.433 kv distribution transformer and lt line under different schemes in the (onm) circle dindori
Read moreDesign supply erection testing and commissioning of 25kv 50 hz single phase conventional type overhead equipment sub sectioning and paralleling post and associated modifications associated general electrical work for construction of new line
Design supply erection testing and commissioning of 25kv 50 hz single phase conventional type overhead equipment sub sectioning and paralleling post and associated modifications associated general electrical work for construction of new line
Read moreof your Industry type