Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation And Maintenance For Sultanpur Water Supply Scheme, Minakhan Block Under Hasnabad Sub Division, P.H. Engg. Dte. Under Barasat Division, P.H. Engg. Dte. Period For 1 Year
|
| Description |
Operation And Maintenance &Amp#X0d
For Sultanpur Water Supply Scheme, Minakhan Block Under Hasnabad Sub Division, P.H. Engg. Dte. Under Barasat Division, P.H. Engg. Dte. Period For 1 Year.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHED_690877_5 |
|
Reference Number |
WB/PHED/AE/HSD/NIET-02/HSD OF 2024-25 |
| Tender Fee | 0 |
| EMD | 10326 |
| Tender Value | - |
| Place | Sultanpur, Minakhan, North 24 Pgs. |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1505529 |
| Start Date | June 11, 2024 23:30 |
| End Date |
Expired
24/06/2024
Expired 840 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreManning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Manning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Read moreWork descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Work descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Read moreOperation and maintenance of kslisp stage-i pumping station at nagireddypally (v), narva (m) and stage-ii pumping station at teelair (v), marikal (m), narayanpet district for the period of three years from 11.11.2026 to 10.11.2029.
Operation and maintenance of kslisp stage-i pumping station at nagireddypally (v), narva (m) and stage-ii pumping station at teelair (v), marikal (m), narayanpet district for the period of three years from 11.11.2026 to 10.11.2029.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreOperation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)
Read moreConstruction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte.
Construction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte. e
Read moreConstruction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte.
Construction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte.
Read moreConsulting services as support organization in hingalganj, sandeshkhaliii, haroa, sandeshkhali i, hasnabad, amdanga, baduria, barasat i, barasat ii, basirhat ii, bongaon,habra ii,basirhat i blocks of north 24 parganas district under wbadmip phase ii
Consulting services as support organization in hingalganj, sandeshkhaliii, haroa, sandeshkhali i, hasnabad, amdanga, baduria, barasat i, barasat ii, basirhat ii, bongaon, habra ii,basirhat i blocks of north 24 parganas district under wbadmip phaseii
Read moreLand development at over head reservoir site for augmentation of padmapukuria water supply scheme (zone-i), minakhan block under hasnabad sub-division, phe dte. under barasat division, phe dte.
Land development at over head reservoir site for augmentation of padmapukuria water supply scheme (zone-i), minakhan block under hasnabad sub-division, phe dte. under barasat division, phe dte.
Read moreof your Industry type