Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Of Iron Elimination Plant At Chandpur W/S Scheme (Z I), Minakhan Block, Hasnabad Sub Division, P.H.E. Dte.
|
| Description |
Improvement Of Iron Elimination Plant At Chandpur W/S Scheme (Z I), Minakhan Block, Hasnabad Sub Division, P.H.E. Dte.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHED_784536_3 |
|
Reference Number |
WB/PHED/AE/HSD/NIET-25/HSD OF 2024-25 |
| Tender Fee | 0 |
| EMD | 9658 |
| Tender Value | - |
| Place | Chandpur Hasnabad North 24 Pgs. |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1739185 |
| Start Date | December 16, 2024 23:30 |
| End Date |
Expired
07/01/2025
Expired 647 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Day to day operation and maintenance work of pump motor set and allied job for hingalganj ps, hasnabad ps, hemnagar costal ps, sandeshkhali ps, minakhan ps, swarupnagar ps under basirhat police district for fy 2026-2027. (2nd call)
Day to day operation and maintenance work of pump motor set and allied job for hingalganj ps, hasnabad ps, hemnagar costal ps, sandeshkhali ps, minakhan ps, swarupnagar ps under basirhat police district for fy 2026-2027. (2nd call)
Read morePmc services for dpr pre constr activities supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Read moreCap becosules z,tab azithral 500 mg,tab fluconazole 150 mg,tab cefexime 200 mg,tab cipcal 500,cap pantoprazole 40 and domperidone,tab domperidone,tab dolo 650,eye drop ciplox,eyeapplicable chloramphenicol,tab sinarest,tab gabapentin 150 mg,tab neurobion forte,syp liv 52,ear drop clotrimazole and lignocaine,powder ors,susp azithral 200,powder nilosprin,tab supradyn,syp calcimax p,syp khasigo dx,syrup digestive enzyme,syp domperidone,syp iron tonic adult,syp paracip 250,syp ibugesic plus,syp torex junior,syp solvin cold,liquid biocil mps,tab acyclovir 400 mg,liquid alkacitral,liquid laxikem,tab limcee,tab amlip 5 mg,syp cetrizine,eye drop carboxymethylcellulose,syp cefexime 50 mg,syp albendazole,syp vitamin b complex multivitamin p,tab albendazole 400 mg,tab meftal spas,tab digene,syp meftal spas,tab oflox oz,syp ambrodil s,oint kt 5 derm,oint burnheal,cap novobiotic,tab gerbisa,tab montas l,tab cetrizine,tab dicloflam plus sp,tab chymoral forte,tab vertin 16,tab norfloxacin 400,lotion calacare,cap amoxycillin
Cap becosules z,tab azithral 500 mg,tab fluconazole 150 mg,tab cefexime 200 mg,tab cipcal 500,cap pantoprazole 40 and domperidone,tab domperidone,tab dolo 650,eye drop ciplox,eyeapplicable chloramphenicol,tab sinarest,tab gabapentin 150 mg,tab neurobion forte,syp liv 52,ear drop clotrimazole and lignocaine,powder ors,susp azithral 200,powder nilosprin,tab supradyn,syp calcimax p,syp khasigo dx,syrup digestive enzyme,syp domperidone,syp iron tonic adult,syp paracip 250,syp ibugesic plus,syp torex junior,syp solvin cold,liquid biocil mps,tab acyclovir 400 mg,liquid alkacitral,liquid laxikem,tab limcee,tab amlip 5 mg,syp cetrizine,eye drop carboxymethylcellulose,syp cefexime 50 mg,syp albendazole,syp vitamin b complex multivitamin p,tab albendazole 400 mg,tab meftal spas,tab digene,syp meftal spas,tab oflox oz,syp ambrodil s,oint kt 5 derm,oint burnheal,cap novobiotic,tab gerbisa,tab montas l,tab cetrizine,tab dicloflam plus sp,tab chymoral forte,tab vertin 16,tab norfloxacin 400,lotion calacare,cap amoxycillin
Read moreIron elimination plant
Improvement of iron elimination plant and other related allied works at kurulia (zone - i) w/s scheme within the jurisdiction of bongaon sub-division under barasat division, p.h.e. dte.
Read moreConstruction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte.
Construction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte. e
Read moreConstruction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte.
Construction of approach road with cement concrete at ph no.-1 within sultanpur w/s scheme, minakhan block under hasnabad sub-division p.h.e. dte.
Read moreConst. of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at ph no.-1 (size-5.40x3.60 mtr.) for augmentation of chandpur w/s scheme (z-i), hasnabad block under hasnabad sub-divn, p.h.e. dte.
Const. of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at ph no.-1 (size-5.40x3.60 mtr.) for augmentation of chandpur w/s scheme (z-i), hasnabad block under hasnabad sub-division, p.h.e. dte.
Read moreDay to day repair, operation and maintenance of distribution system, rising main and allied pipelines for atpukur water supply scheme, z-ii, minakhan block under hasnabad sub-divn. p.h.e. dte. (period - for 6 months).
Day to day repair, operation and maintenance of distribution system, rising main and allied pipelines for atpukur water supply scheme, z-ii, minakhan block under hasnabad sub-divn. p.h.e. dte. (period - for 6 months).
Read moreOperation and guarding of pumping machinery under chandpur w_s scheme block hasnabad, dist. north 24 pgs. under eastern mechanical division, p.h.e. dte.
Operation and guarding of pumping machinery under chandpur w_s scheme block hasnabad, dist. north 24 pgs. under eastern mechanical division, p.h.e. dte.
Read moreAnnual operation and maintenance of arsenic iron removal plant for ashariya narayanpur w/s scheme, hasnabad block under hasnabad sub-division p.h.e. dte. period 1 year.
Annual operation and maintenance of arsenic iron removal plant for ashariya narayanpur w/s scheme, hasnabad block under hasnabad sub-division p.h.e. dte. period 1 year.
Read moreof your Industry type