Tender Details
Particulars | Details |
---|---|
Title |
Tender For Construction Of Foundation Base Of Transformer Yard In Front Of Existing Generator Transformer No.01 For Spare 01 No. Generator Transformer And 01 No. Unit Transformer Auxiliary Transformer To Shift From Stps Sarni To Sgtps Birsinghpur
|
Description |
Tender For Construction Of Foundation Base Of Transformer Yard In Front Of Existing Generator Transformer No.01 For Spare 01 No. Generator Transformer And 01 No. Unit Transformer Auxiliary Transformer To Shift From Stps Sarni To Sgtps Birsinghpur
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2025_MPPGC_407820_1 |
Reference Number |
SEC/BRS/720 |
Tender Fee | 795 |
EMD | 19600 |
Tender Value | |
Place | SGTPS MPPGCL Birsinghpur |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=483333 |
Start Date | March 29, 2025 00:25 |
End Date |
18/04/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreWard no. 02 construction of c.c. road from vishal thakur house in radha nagar to siyaram and from sonu house in sharda nagar to liladhar house
Ward no. 02 construction of c.c. road from vishal thakur house in radha nagar to siyaram and from sonu house in sharda nagar to liladhar house
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreProcurement of industrial grey cpvc pipes confirming to standard astm-f-441 and cpvc fitting confirming to standard astm-f-439 for socket end for etp plant and tg-bop area of unit no. 10 and 11, ph-iv, stps, mppgcl, sarni.
Procurement of industrial grey cpvc pipes confirming to standard astm-f-441 and cpvc fitting confirming to standard astm-f-439 for socket end for etp plant and tg-bop area of unit no. 10 and 11, ph-iv, stps, mppgcl, sarni.
Read moreConstruction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Read moreConstruction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Read moreSelection of agency for door-to-door collection, segregation of municipal solid waste from each establishment and transportation to the processing site for ward no. 11 to 20 in municipal corporation, hisar.
Selection of agency for door-to-door collection, segregation of municipal solid waste from each establishment and transportation to the processing site for ward no. 11 to 20 in municipal corporation, hisar.
Read moreof your Industry type