Tender Details
Particulars | Details |
---|---|
Title |
Special Repair On Giroura Boddh Vihar Atranji Kheda Road Odr In Km 1,2,3,4,5(700),6 (900),7, 8 In Fy 2024 25
|
Description |
Special Repair On Giroura Boddh Vihar Atranji Kheda Road Odr In Km 1,2,3,4,5(700),6 (900),7, 8 In Fy 2024 25
|
Organisation | Chief Engineer Aligarh Zone PWD Aligarh | State Govt. and UT |
Tender Id | 2025_CEALG_1000096_1 |
Reference Number |
533/Cashier Date 23.01.2025 |
Tender Fee | 2354 |
EMD | 10.33 Lakh |
Tender Value | |
Place | ETAH |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1777342 |
Start Date | January 30, 2025 18:00 |
End Date |
05/02/2025 ( Expired 106 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc batala group no-6
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc batala group no-6
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc batala group no-7
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc batala group no-7
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreSupply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreof your Industry type