Tender Details

Particulars Details
Title
Wbpwd/Ee/Asndvn/E Nit11/2023 24
Description
Replacement Of Damaged Drain By New Construction In Between Chainage 440.300km To 440.350km Of G.T. Road Under Asansol Division In The District Of Paschim Bardhaman.
Organisation Government of West Bengal
Tender Id 2023_PWD_546975_3
Reference
Number
WBPWD/EE/ASNDVN/eNIT11/2023-24
Tender Fee
EMD 5583
Tender Value
Place Office of the Executive Engineer, PWD, Asansol Div
Link https://wbtenders.gov.in
Start Date July 15, 2023 19:30
End Date

26/07/2023 ( Expired 685 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of mipi-andrathang road from km 20.000 to 50.000

Construction of mipi-andrathang road from km 20.000 to 50.000&#x0d (design length 34.880 km between km 20.000 to 54.880)green field&#x0d alignment to nhsl specifications in the aor of 62 rcc under 752 brtf&#x0d of project udayak in arunachal pradesh state

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode

Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Read more
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.

Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.

Read more
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.

Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.

Read more
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise