Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Mtrl For Provision Of Aios Bunker Rcc Framed Structure With Rcc Roof Pcc Brick Wall Etc,E
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3541635 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 08, 2023 02:59 |
| End Date |
Expired
28/06/2023
Expired 1208 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | BURLINGTON STEEL INDUSTRIES | - | 29-06-2023 13:14:19 | MSE | MII MSE | Qualified |
| 2 | JAY AAR and CO | - | 27-06-2023 22:48:00 | MSE | MII MSE | Qualified |
| 3 | RAMNEEK ENTERPRISES | - | 27-06-2023 22:52:36 | MSE | MII MSE | Qualified |
| 4 | RUDRAKSH TRADERS | - | 07-07-2023 19:57:45 | MSE | MII MSE | Qualified |
Construction of temporary structure at roof of existing new degree campus of tit during the year 2025-26 sh constn of rcc brick work tiles work aluminium works gci sheet providing internal electrification on the roof of the existing building
Construction of temporary structure at roof of existing new degree campus of tit during the year 2025-26 sh constn of rcc brick work tiles work aluminium works gci sheet providing internal electrification on the roof of the existing building
Read moreInvestigation design and construction of civil structure (sub structure super structure) works for spire, roof, rcc framed structure consisting of retaining wall, shear core wall, slabs, beam, pt slab and beam inclined flared shear walls, columns, using modular system fair finish express formwork, reinforcement works, panoramic and inclined lifts, waterproofing miscellaneous works for legislative assembly building in super block e of amaravati government complex area in amaravati capital
Investigation design and construction of civil structure (sub structure super structure) works for spire, roof, rcc framed structure consisting of retaining wall, shear core wall, slabs, beam, pt slab and beam inclined flared shear walls, columns, using modular system fair finish express formwork, reinforcement works, panoramic and inclined lifts, waterproofing miscellaneous works for legislative assembly building in super block e of amaravati government complex area in amaravati capital
Read moreC/o fruit and vegetable sub market yard at chamba, distt. chamba h.p. sh c/o shops with rcc framed structure at front and back side of yard with proper protection work etc.
C/o fruit and vegetable sub market yard at chamba, distt. chamba h.p. sh c/o shops with rcc framed structure at front and back side of yard with proper protection work etc.
Read moreDevelopment of integrated office complex at the existing dtc depot ip estate new delhi. composite works of construction of dtc hq building (2b and g and 11 stories) with rcc framed structure design including water supply etc...
Development of integrated office complex at the existing dtc depot ip estate new delhi. composite works of construction of dtc hq building (2b and g and 11 stories) with rcc framed structure design including water supply etc...
Read moreDismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Read more8515/e8 maint and repair/replacement to brick work, plastering work, pcc flooring, leakage/seepage, roofing sheet, ceiling, tiling of roof treatment and plumbing works including internal electrification of offrs accn under ge (east) bareilly
8515/e8 maint and repair/replacement to brick work, plastering work, pcc flooring, leakage/seepage, roofing sheet, ceiling, tiling of roof treatment and plumbing works including internal electrification of offrs accn under ge (east) bareilly
Read moreExcavation,rubble soling,pcc m15,rcc m25,shuttering,brick masonary 230 mm thick,plaster 15mm thick,reinforcement,back filling for raising height,ultratech rapid hard rmc concrete m30 including trimix and grove cutting,150 micron ldp sheet,providing and laying 300mm rcc hume pipe
Excavation,rubble soling,pcc m15,rcc m25,shuttering,brick masonary 230 mm thick,plaster 15mm thick,reinforcement,back filling for raising height,ultratech rapid hard rmc concrete m30 including trimix and grove cutting,150 micron ldp sheet,providing and laying 300mm rcc hume pipe
Read moreProvision of water proofing treatment over building no p-06 for dharampur, provision of rcc drain and duct covers, masonary wall and other connected works to jetty at dhq 1, provn of precast pcc paver blocks and connected works near mes power house t
Provision of water proofing treatment over building no p-06 for dharampur, provision of rcc drain and duct covers, masonary wall and other connected works to jetty at dhq 1, provn of precast pcc paver blocks and connected works near mes power house t
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreof your Industry type