Tender Details
About Tender
🏗️ Invitation For Bids: Major Bridge Construction Project 🌉 The Public Works Region, On Behalf Of The State Government, Invites Bids From Reputable Contractors For The Construction Of A Major Bridge On The Pench River At On Kothurna Salai, Chargaon, Neurwada Bondri, Khumari, Lendazari, Road (Sh 337) In Km. 20/200, Taluka Parsonni, District Nagpur. 📅 Bid Submission Deadline: May 20, 2024, 6:00 Pm Earnest Money Deposit (Emd): Inr 18,27,000 Interested Contractors Must Submit Detailed Bids, Including Technical Capabilities, Project Execution Plans, And Financial Bids, By The Stipulated Deadline. Keywords: Construction, Major Bridge, Pench River, Road Infrastructure, Public Works Region, State Government, Ut, Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Construction Of Major Bridge On Pench River At On Kothurna Salai Chargaon Nawegaon Neurwada Bondri Khumari Lendazari Road (Sh 337) In Km. 20/200 In Taluka Parseoni District Nagpur
|
Description |
Construction Of Major Bridge On Pench River At On Kothurna Salai Chargaon Nawegaon Neurwada Bondri Khumari Lendazari Road (Sh 337) In Km. 20/200 In Taluka Parseoni District Nagpur
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1036216_1 |
Reference Number |
NAG/SP/CD/ 102.1 /2023-24 |
Tender Fee | 0 |
EMD | 18.27 Lakh |
Tender Value | |
Place | TALUKA PARSEONI DISTRICT NAGPUR |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1811829 |
Start Date | March 15, 2024 21:05 |
End Date |
04/06/2024 ( Expired 373 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Read moreConstruction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Construction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Read moreConstruction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConsrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Read moreConstruction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Read moreConsultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak
Consultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak
Read moreof your Industry type