Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Jcrdlis Ii Accumulated Earth Of Gravity Main Canal From Ashwaraopally Reservoir To Chittakodur Reservoir 9.500 Km To 14.000 Km
|
| Description |
Jcrdlis Ii Accumulated Earth Of Gravity Main Canal From Ashwaraopally Reservoir To Chittakodur Reservoir 9.500 Km To 14.000 Km Jangaon
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 533675 |
|
Reference Number |
02/2024-25 Dt:06.08.2024 |
| Tender Fee | 146 |
| EMD | 4120 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | August 07, 2024 15:00 |
| End Date |
Expired
14/08/2024
Expired 794 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Silt clearance from km. 0.000 to km. 14.000 of gola branch canal
Silt clearance from km. 0.000 to km. 14.000 of gola branch canal
Read moreEarth work in silt clearence of karahi dy from km 14.000 to km 18.250
Earth work in silt clearence of karahi dy from km 14.000 to km 18.250
Read moreSilt clearance and scrapping and jungle clearence from km. 14.000 to km. 27.500 of gola branch canal
Silt clearance and scrapping and jungle clearence from km. 14.000 to km. 27.500 of gola branch canal
Read moreRepair work for the urram reservoir canal system comprising construction of rcc aquaduct at canal rd 840 m. construction of a cd (cross drainage) structure at canal rd 1320 m. and repair of canal banks (using earth work) and cc lining at various loca
Repair work for the urram reservoir canal system comprising construction of rcc aquaduct at canal rd 840 m. construction of a cd (cross drainage) structure at canal rd 1320 m. and repair of canal banks (using earth work) and cc lining at various loca
Read moreLining repair and construction of balance works of right main canal and its structures of package 1 (rd 0 to 17.16 km) under north koel reservoir project jharkhand
Lining repair and construction of balance works of right main canal and its structures of package 1 (rd 0 to 17.16 km) under north koel reservoir project jharkhand
Read moreLining repair and construction of balance works of right main canal and its structures of package 2 (rd 17.16 to 31.40 km) under north koel reservoir project jharkhand
Lining repair and construction of balance works of right main canal and its structures of package 2 (rd 17.16 to 31.40 km) under north koel reservoir project jharkhand
Read more-main canal water distribution during 2026-27 engaging labour for watching canal and for clearing obstructions including removal of slipped earth during water distribution and clearing light jungle in the forest area from ch16360 m to 28800 m of mai
Main canal water distribution during 2026 27
Read moreFormation of pre-bid tie-up and post-award execution tie-up through mou for lining, repair and construction of balance works of right main canal and its structures of package-1 (rd 0 to 17.16 km) under north koel reservoir project, jharkhand
Formation of pre-bid tie-up and post-award execution tie-up through mou for lining, repair and construction of balance works of right main canal and its structures of package-1 (rd 0 to 17.16 km) under north koel reservoir project, jharkhand
Read moreProviding laying and jointing of ac pressure pipe by mazza process of 500 mm dia 3.07 km for main canal class 20 as is code 1592 2003 and is code 6530 1972 with all fittings and outlets as per drawing enclosed including earth work
Providing laying and jointing of ac pressure pipe by mazza process of 500 mm dia 3.07 km for main canal class 20 as is code 1592 2003 and is code 6530 1972 with all fittings and outlets as per drawing enclosed including earth work
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type