Jcrdlis Ii Accumulated Earth Of Gravity Main Canal From Ashwaraopally Reservoir To Chittakodur Reservoir 9.500 Km To 14.000 Km
Description
Jcrdlis Ii Accumulated Earth Of Gravity Main Canal From Ashwaraopally Reservoir To Chittakodur Reservoir 9.500 Km To 14.000 Km Jangaon
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 533675
Reference
Number
02/2024-25 Dt:06.08.2024
Tender Fee 146
EMD 4120
Tender Value -
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date August 07, 2024 15:00
End Date
Expired 14/08/2024

Expired 794 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Silt clearance from km. 0.000 to km. 14.000 of gola branch canal

Silt clearance from km. 0.000 to km. 14.000 of gola branch canal

Read more
Earth work in silt clearence of karahi dy from km 14.000 to km 18.250

Earth work in silt clearence of karahi dy from km 14.000 to km 18.250

Read more
Silt clearance and scrapping and jungle clearence from km. 14.000 to km. 27.500 of gola branch canal

Silt clearance and scrapping and jungle clearence from km. 14.000 to km. 27.500 of gola branch canal

Read more
Repair work for the urram reservoir canal system comprising construction of rcc aquaduct at canal rd 840 m. construction of a cd (cross drainage) structure at canal rd 1320 m. and repair of canal banks (using earth work) and cc lining at various loca

Repair work for the urram reservoir canal system comprising construction of rcc aquaduct at canal rd 840 m. construction of a cd (cross drainage) structure at canal rd 1320 m. and repair of canal banks (using earth work) and cc lining at various loca

Read more
Lining repair and construction of balance works of right main canal and its structures of package 1 (rd 0 to 17.16 km) under north koel reservoir project jharkhand

Lining repair and construction of balance works of right main canal and its structures of package 1 (rd 0 to 17.16 km) under north koel reservoir project jharkhand

Read more
Lining repair and construction of balance works of right main canal and its structures of package 2 (rd 17.16 to 31.40 km) under north koel reservoir project jharkhand

Lining repair and construction of balance works of right main canal and its structures of package 2 (rd 17.16 to 31.40 km) under north koel reservoir project jharkhand

Read more
Formation of pre-bid tie-up and post-award execution tie-up through mou for lining, repair and construction of balance works of right main canal and its structures of package-1 (rd 0 to 17.16 km) under north koel reservoir project, jharkhand

Formation of pre-bid tie-up and post-award execution tie-up through mou for lining, repair and construction of balance works of right main canal and its structures of package-1 (rd 0 to 17.16 km) under north koel reservoir project, jharkhand

Read more
Providing laying and jointing of ac pressure pipe by mazza process of 500 mm dia 3.07 km for main canal class 20 as is code 1592 2003 and is code 6530 1972 with all fittings and outlets as per drawing enclosed including earth work

Providing laying and jointing of ac pressure pipe by mazza process of 500 mm dia 3.07 km for main canal class 20 as is code 1592 2003 and is code 6530 1972 with all fittings and outlets as per drawing enclosed including earth work

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise