Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing/Maintenance, Checking/Testing, Painting Of Old Pontoons (05 Nos.), Making Of Railing And Grilling On Each Pontoon (05 Nos.) And Fabrication Of Walk Way And Ladders For Approach On Pontoons (07 Nos.) Required During Monsoon 2025 At Bina Proj
|
Description |
Repairing/Maintenance, Checking/Testing, Painting Of Old Pontoons (05 Nos.), Making Of Railing And Grilling On Each Pontoon (05 Nos.) And Fabrication Of Walk Way And Ladders For Approach On Pontoons (07 Nos.) Required During Monsoon 2025 At Bina Proj
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_328094_1 |
Reference Number |
B/EM/eTender/2024-25/77 dt. 06.02.2025 |
Tender Fee | 0 |
EMD | 7700 |
Tender Value | |
Place | Bina Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340077 |
Start Date | February 08, 2025 14:30 |
End Date |
20/02/2025 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area
Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area
Read moreFabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26
Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26
Read moreSurvey design fabrication supply installation testing and commissioning of total 07 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Survey design fabrication supply installation testing and commissioning of total 07 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Read moreRepairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Read moreFabrication of various sizes pontoon and safety railing along the four sides of a pontoon including supply of iron materials and plastic/iron drums with making of shed for pump and motor and repairing of old pontoons of ananta ocp, jagannath area
Fabrication of various sizes pontoon and safety railing along the four sides of a pontoon including supply of iron materials and plastic/iron drums with making of shed for pump and motor and repairing of old pontoons of ananta ocp, jagannath area
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Read moreRepairing of three number of old pontoons and fabrication of two nos new pontoon before monsoon at jhingurda project
Repairing of three number of old pontoons and fabrication of two nos new pontoon before monsoon at jhingurda project
Read moreRepairing old pontoon (7 sets) and making of new pontoons (4 sets) for installation during monsoon in the coal and east section of dudhichua
Repairing old pontoon (7 sets) and making of new pontoons (4 sets) for installation during monsoon in the coal and east section of dudhichua
Read moreFabrication of new pontoon (03 nos.) in complete aspect and fabrication of floating drum structures (06 nos.), making of sheds on pontoons (07 nos.) to be installed for monsoon 2025 at bina project
Fabrication of new pontoon (03 nos.) in complete aspect and fabrication of floating drum structures (06 nos.), making of sheds on pontoons (07 nos.) to be installed for monsoon 2025 at bina project
Read moreof your Industry type