Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fabrication Of New Pontoon (03 Nos.) In Complete Aspect And Fabrication Of Floating Drum Structures (06 Nos.), Making Of Sheds On Pontoons (07 Nos.) To Be Installed For Monsoon 2025 At Bina Project
|
Description |
Fabrication Of New Pontoon (03 Nos.) In Complete Aspect And Fabrication Of Floating Drum Structures (06 Nos.), Making Of Sheds On Pontoons (07 Nos.) To Be Installed For Monsoon 2025 At Bina Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_328440_1 |
Reference Number |
B/EM/eTender/2024-25/80 dt. 09.02.2025 |
Tender Fee | 0 |
EMD | 8100 |
Tender Value | |
Place | Bina Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340450 |
Start Date | February 11, 2025 14:30 |
End Date |
22/02/2025 ( Expired 130 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fabrication with fixing/grouting of i love (symbol) orient and great place to work mahanadi coalfields limited (made of 3mm acp and acrylic 3d letters installed on 4 nos of ms square grid and making of glow sign board) at ecopark, mine no. 4,oa
Fabrication with fixing/grouting of i love (symbol) orient and great place to work mahanadi coalfields limited (made of 3mm acp and acrylic 3d letters installed on 4 nos of ms square grid and making of glow sign board) at ecopark, mine no. 4,oa
Read moreWbpw(r)d/nit- 07 of se/whc-i/2025-2026/1
Mollarpur majipara bolpur road from 18.0 km to 31.3 km, strengthening work including construction of 10 nos. of cd structures under birbhum highway division no. i in the district of&#x0d birbhum.
Read moreComprehensive servicing and maintenance of 09 nos lifts installed at various bmc offices and premises for period of 36months from 01 07 2025 to 30 06 2028
Comprehensive servicing and maintenance of 09 nos lifts installed at various bmc offices and premises for period of 36months from 01 07 2025 to 30 06 2028
Read moreCa no. ge af no.1/gur-06/2025-26 repair to wooden furniture including polising to wooden furniture and in block nos p/144 to p/153 in sekhon vihar area repair /polishing of furniture should be carried out in above block omq on priority basis yard als
Ca no. ge af no.1/gur-06/2025-26 repair to wooden furniture including polising to wooden furniture and in block nos p/144 to p/153 in sekhon vihar area repair /polishing of furniture should be carried out in above block omq on priority basis yard als
Read moreCa no. ge af no.1/gur-07/2025-26 repair to steel furniture including painting to steel furniture in block nos p/144 to p/153 in sekhon vihar area repair of furniture should be carried out in above block omq on priority basis yard alsoat af stn palam
Ca no. ge af no.1/gur-07/2025-26 repair to steel furniture including painting to steel furniture in block nos p/144 to p/153 in sekhon vihar area repair of furniture should be carried out in above block omq on priority basis yard also at afstn palam
Read moreFabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26
Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26
Read moreEngaging emergency labour in 3 shifts (24 hrs) for attending monsoon emergency works at various locations on main roads of ward-92, venkateshwara colony, cir-18, kz, ghmc from 01-06-2025 to 31-10-2025
Engaging emergency labour in 3 shifts (24 hrs) for attending monsoon emergency works at various locations on main roads of ward-92, venkateshwara colony, cir-18, kz, ghmc from 01-06-2025 to 31-10-2025
Read moreFabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area
Fabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area
Read moreComplete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.
Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.
Read moreDeployment of 2 nos of close truck vehicles, on hire basis for the use of ndrf team deployed in eastern suburbs of brihanmumbai during monsoon period 2025 for attending to landslide disaster
Deployment of 2 nos of close truck vehicles, on hire basis for the use of ndrf team deployed in eastern suburbs of brihanmumbai during monsoon period 2025 for attending to landslide disaster
Read moreof your Industry type