Tender Details

Particulars Details
Title
Fabrication Of New Pontoon (03 Nos.) In Complete Aspect And Fabrication Of Floating Drum Structures (06 Nos.), Making Of Sheds On Pontoons (07 Nos.) To Be Installed For Monsoon 2025 At Bina Project
Description
Fabrication Of New Pontoon (03 Nos.) In Complete Aspect And Fabrication Of Floating Drum Structures (06 Nos.), Making Of Sheds On Pontoons (07 Nos.) To Be Installed For Monsoon 2025 At Bina Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_328440_1
Reference
Number
B/EM/eTender/2024-25/80 dt. 09.02.2025
Tender Fee 0
EMD 8100
Tender Value
Place Bina Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340450
Start Date February 11, 2025 14:30
End Date

22/02/2025 ( Expired 85 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ca no. ge af no.1/gur-06/2025-26 repair to wooden furniture including polising to wooden furniture and in block nos p/144 to p/153 in sekhon vihar area repair /polishing of furniture should be carried out in above block omq on priority basis yard als

Ca no. ge af no.1/gur-06/2025-26 repair to wooden furniture including polising to wooden furniture and in block nos p/144 to p/153 in sekhon vihar area repair /polishing of furniture should be carried out in above block omq on priority basis yard als

Read more
Ca no. ge af no.1/gur-07/2025-26 repair to steel furniture including painting to steel furniture in block nos p/144 to p/153 in sekhon vihar area repair of furniture should be carried out in above block omq on priority basis yard alsoat af stn palam

Ca no. ge af no.1/gur-07/2025-26 repair to steel furniture including painting to steel furniture in block nos p/144 to p/153 in sekhon vihar area repair of furniture should be carried out in above block omq on priority basis yard also at afstn palam

Read more
Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26

Fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the main sump and repairing, painting of base frame and er shed for quick dewatering in the upcoming monsoon 2025-26

Read more
Fabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area

Fabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area

Read more
Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.

Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.

Read more
Deployment of 2 nos of close truck vehicles, on hire basis for the use of ndrf team deployed in eastern suburbs of brihanmumbai during monsoon period 2025 for attending to landslide disaster

Deployment of 2 nos of close truck vehicles, on hire basis for the use of ndrf team deployed in eastern suburbs of brihanmumbai during monsoon period 2025 for attending to landslide disaster

Read more
Fabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area

Fabrication of 4 nos complete box pontoons set and 2 nos complete drum pontoons set for monsoon preparedness at jagannathpur ocp, bhatgaon area

Read more
Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.

Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.

Read more
Amc of 14 nos lifts installed in family quarters from block a to e 120 men barrack and nirmal bwwa complex for one year fy 2025 26 at 25 bn bsf chhawla under dig hq fhq bsf new delhi

Amc of 14 nos lifts installed in family quarters from block a to e 120 men barrack and nirmal bwwa complex for one year fy 2025 26 at 25 bn bsf chhawla under dig hq fhq bsf new delhi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise