Tender Details

Particulars Details
Title
Fluid Coupling With Pulley For Ap Mixer Pr 3000011308
Description
Organisation Materials | Ministry of Mines
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date July 03, 2025 16:26
End Date

25/07/2025 ( 21 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: Ashutosh Kumar
Address: Ashutosh Kumar,[email protected],PURCHASE DEPARTMENT, NALCO SMELTER PLANT, NALCO NAGAR,ANGUL,ODISHA,759145,India,6764-220459-
Ministry: Ministry Of Mines
Department: Materials
Organisation: National Aluminium Company Limited, Bhubaneswar
Office Address: Materials
Similar Tenders
Mr pressure injector syringe kit with tubing compatible with bayer mr pressure injector

Procurement of mr pressure injector syringe kit with tubing compatible with bayer mr pressure injector for the dept. of radio-diagnosis, aiims kalyani

Read more
Air brake hose coupling for brake

For complete deion and other details, please refer to tender

Read more
Invitation of bids to develop petroleum and petroleum product (lpg) pipeline from mumbai to jalgaon with a spur from nasik to aurangabad

Grant of authorization for laying, building, operating or expanding petroleum and petroleum product pipeline from mumbai to jalgaon with a spur from nasik to aurangabad

Read more
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Rfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)

Rfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)

Read more
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Read more
Appointment of safety consultant for the ham projects improvement and up-gradation in 2lane with ps configuration of newly declared nh-227b bahuvan madar majha to jagarnathpur(design km 160.200 to km 224.040)84 kosi parikrama marg in the state of up

Appointment of safety consultant for the ham projects improvement and up-gradation in 2lane with ps configuration of newly declared nh-227b bahuvan madar majha to jagarnathpur(design km 160.200 to km 224.040)84 kosi parikrama marg in the state of up

Read more
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise