Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Construction Of 08 Nos Fall, 03 Nos Inlet And 01 Nos Weir Structure On Rullaheri Sarasvati Tributory To Ensure Smooth Flow.
|
| Description |
Work Of Construction Of 08 Nos Fall, 03 Nos Inlet And 01 Nos Weir Structure On Rullaheri Sarasvati Tributory To Ensure Smooth Flow.
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_434272_1 |
|
Reference Number |
2025CF4855C7 BE0B 45E6 9BA5 02497B6CFC25463IRR |
| Tender Fee | 6180 |
| EMD | 1.43 Lakh |
| Tender Value | - |
| Place | CHHALAUR MILKHERA MUGALWALI ROHALHERI |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=511450 |
| Start Date | March 19, 2025 15:30 |
| End Date |
Expired
01/04/2025
Expired 562 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design construction of rcc over head tank at zero degree scheme no.41, jabalpur capacity 1250 kl and staging 20 meter from the road level in circular shape on column structure including providing and fixing of inlet, outlet, scour and over flow pipe
Design construction of rcc over head tank at zero degree scheme no.41, jabalpur capacity 1250 kl and staging 20 meter from the road level in circular shape on column structure including providing and fixing of inlet, outlet, scour and over flow pipe
Read moreWork of construction of 13 nos falls , 03 nos inlet and 01 nos weir structure on rullaheri sarasvati tributory to ensure smooth flow.
Work of construction of 13 nos falls , 03 nos inlet and 01 nos weir structure on rullaheri sarasvati tributory to ensure smooth flow.
Read moreWatch and ward of paonta weir gate and structure head regulator and cross regulator gates and their structure tunnel inlet gate and structure back regulator gate and escape channel structure under hydel generation division khara badshahibagh round th
Watch and ward of paonta weir gate and structure head regulator and cross regulator gates and their structure tunnel inlet gate and structure back regulator gate and escape channel structure under hydel generation division khara badshahibagh round th
Read moreProj.no.316/24 div.47 to ensure smooth flow of water in the drain near thoppupalli and to level the covering slab of the drain near the kennedy memorial library
Proj.no.316/24 div.47 to ensure smooth flow of water in the drain near thoppupalli and to level the covering slab of the drain near the kennedy memorial library
Read moreConstruction of bridge at rd.1615m and 2588m, 10 nos of inlet structure and improvement of service road from rd.60m to 900m at right main canal of rajua di weir project.
Construction of bridge at rd.1615m and 2588m, 10 nos of inlet structure and improvement of service road from rd.60m to 900m at right main canal of rajua di weir project.
Read moreSdp nilackal 1199me removing and cleaning the soil and silt from the existing drains for smooth flow of rainwater and providing precast slabs over the drains at various locations and fixing the metal beam crashbarrier to ensure safety of pilgrims.
Sdp nilackal 1199me removing and cleaning the soil and silt from the existing drains for smooth flow of rainwater and providing precast slabs over the drains at various locations and fixing the metal beam crashbarrier to ensure safety of pilgrims.
Read morePorted iv canula should be with vialon biomaterial which becomes up to 70 percent softer once inside vein and pliable for high indwelling time, biocompatibility and hemocompatibility thus reducing thrombophlebitis. vialon biomaterial also ensures low platelet adherence thus ensures consistent flow rates. it should be kink resistant cannula with an extremely smooth and outer surfaces, tapered catheter tip to ensure easy veni - puncture with minimum trauma .should have super sharp stainle
For complete deion and other details, please refer to tender
Read morePorted iv canula should be with vialon biomaterial which becomes up to 70 percent softer once inside vein and pliable for high indwelling time, biocompatibility and hemocompatibility thus reducing thrombophlebitis. vialon biomaterial also ensures low platelet adherence thus ensures consistent flow rates. it should be kink resistant cannula with an extremely smooth and outer surfaces, tapered catheter tip to ensure easy veni - puncture with minimum trauma .should have super sharp stain
For complete deion and other details, please refer to tender
Read moreof your Industry type