Tender Details
About Tender
🏗️ Invitation For Bids: U Type Drain Construction At Dehradun 🏙️ The Vice Chairman Of Mussoorie Dehradun Development Authority (Mdda), A State Government And Union Territory Entity, Invites Bids For The Construction Of A U Type Drain At Ward 62, Tapovan Road, Vishnu Lok Colony, Dehradun. 📅 Bid Submission Deadline: July 11, 2024, 2:00 Pm Tender Fee: Inr 2360 Emd: Inr 61500 Interested Contractors Must Possess The Necessary Qualifications And Experience In Civil Construction Projects. Bids Should Include Detailed Project Plans, Cost Estimates, And Timelines For Completion, Adhering To The Specifications And Standards Set Forth In The Tender Documents. Keywords: Construction, U Type Drain, Mussoorie Dehradun Development Authority, Civil Works, Dehradun, Tender, Bid Submission, Emd, Government ContractParticulars | Details |
---|---|
Title |
Construction Of U Type Drain At Ward 62 Tapovan Road Vishnu Lok Colony Dehradun
|
Description |
Construction Of U Type Drain At Ward 62 Tapovan Road Vishnu Lok Colony Dehradun
|
Organisation | Vice Chairman Mussoorie Dehradun Development Authority Dehradun | State Govt. and UT |
Tender Id | 2024_MDDA_73051_1 |
Reference Number |
MDDA/CIVIL/220/54/2024-25 |
Tender Fee | 2360 |
EMD | 61500 |
Tender Value | |
Place | DEHRADUN |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=87583 |
Start Date | July 04, 2024 14:30 |
End Date |
18/07/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreDevelopment of msrtc establishments along with commercial facilities on plot of land owned by the maharashtra state road transport corporation (msrtc) at borivali nancy colony, bhayandar, and safale in mumbai and palghar district through ppp
Development of msrtc establishments along with commercial facilities on plot of land owned by the maharashtra state road transport corporation (msrtc) at borivali nancy colony, bhayandar, and safale in mumbai and palghar district through ppp
Read moreQuality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Read moreof your Industry type