Tender Details

Particulars Details
Title
I.R.Q.P Work In Nh 32 Saraidhela Sugiadih To Hirak Point Road And Central Hospital To Co Operative Colony Road (Total Length 2.230 Km) Under Plan Head For The Year 2024 25
Description
I.R.Q.P Work In Nh 32 Saraidhela Sugiadih To Hirak Point Road And Central Hospital To Co Operative Colony Road (Total Length 2.230 Km) Under Plan Head For The Year 2024 25
Organisation RCD EinC | State Govt. and UT
Tender Id 2025_CECOM_100449_1
Reference
Number
RCD/DHANBAD/591/2025-26 (2nd Call)
Tender Fee 10000
EMD 3.69 Lakh
Tender Value -
Place DHANBAD
Link
View Original Tender Notice

https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=134880

Start Date April 22, 2025 16:00
End Date
Expired 14/05/2025

Expired 519 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supervision consultant services during operation and maintenance period for tuticorin - tiruchendur - kanyakumari section of nh-32 total length - 119/700 km in the state of tamil nadu

Supervision consultant services during operation and maintenance period for tuticorin - tiruchendur - kanyakumari section of nh-32 total length - 119/700 km in the state of tamil nadu

Read more
Howrah division -renewal of channel sleeper by h-beam sleeper total -3645 nos. in hwh division in following locations: -nh - bdc : dn 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; up 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; she - gogt : up 32.322 - 32.356 = 62 nos.;sl 66.044 - 66.076 = 58 nos., 67.951 - 67.984 = 60 nos., 62.031 - 62.494 = 842 nos.; up 0.931 - 0.953 = 38 nos.; dn 0.931 - 0.953 = 38 nos.;bdc - skg : dn 79.23 - 79.252 = 4

Howrah division -renewal of channel sleeper by h-beam sleeper total -3645 nos. in hwh division in following locations: -nh - bdc : dn 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; up 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; she - gogt : up 32.322 - 32.356 = 62 nos.;sl 66.044 - 66.076 = 58 nos., 67.951 - 67.984 = 60 nos., 62.031 - 62.494 = 842 nos.; up 0.931 - 0.953 = 38 nos.; dn 0.931 - 0.953 = 38 nos.;bdc - skg : dn 79.23 - 79.252 = 4

Read more
Z1-5962-669702 microcircuit linear type lmc 662 a oblique m,z1-5910-421184 capacitor fixed ceramic dielectric chip type 2700 pf plus 5 percentage 50vdc,z1-5950-040520 coil radio frequency 194 nh plus 20 percentage at 25 mhz point 6 turns,z1-5340-182169 bracket mounting antenna bracket assy,z1-5905-154859 resistor fixed film chip type 220 k ohmsplus 5 percentage 0 point 1w,z1-5950-040522 coil radio frequency 116nh plus 20 percentage at 25 mhz point 4 turns,z1-misc-4002-710-001-32 resistor cfgp ieplus minus 5 percentage 2w leaded,z7-israel6406-3042-00 eye piece rubber,z7-bel-1700-002-674-69 cleaning set,z7-5999-720091679-harness electrical battery charger no i,z3-misc-2400-242-601-73 lamp extractor

Z1-5962-669702 microcircuit linear type lmc 662 a oblique m,z1-5910-421184 capacitor fixed ceramic dielectric chip type 2700 pf plus 5 percentage 50vdc,z1-5950-040520 coil radio frequency 194 nh plus 20 percentage at 25 mhz point 6 turns,z1-5340-182169 bracket mounting antenna bracket assy,z1-5905-154859 resistor fixed film chip type 220 k ohmsplus 5 percentage 0 point 1w,z1-5950-040522 coil radio frequency 116nh plus 20 percentage at 25 mhz point 4 turns,z1-misc-4002-710-001-32 resistor cfgp ieplus minus 5 percentage 2w leaded,z7-israel6406-3042-00 eye piece rubber,z7-bel-1700-002-674-69 cleaning set,z7-5999-720091679-harness electrical battery charger no i,z3-misc-2400-242-601-73 lamp extractor

Read more
I.r.q.p work in nh-32 saraidhela-sugiadih to hirak point road (length 2.230 km) and central hospital to co- operative colony road (length-1.30 km) total length 3.530 km under plan head for the year 2024-25

I.r.q.p work in nh-32 saraidhela-sugiadih to hirak point road (length 2.230 km) and central hospital to co- operative colony road (length-1.30 km) total length 3.530 km under plan head for the year 2024-25

Read more
I.r.q.p. work of manika (nh 75) to herhanj via matlong road (total length - 32.475 km)

I.r.q.p. work of manika (nh 75) to herhanj via matlong road (total length - 32.475 km).

Read more
I.r.q.p. work of manika (nh 75) to herhanj via matlong road (total length - 32.475 km)

I.r.q.p. work of manika (nh 75) to herhanj via matlong road (total length - 32.475 km)

Read more
I.r.q.p. work of manika (nh 75) to herhanj via matlong road (total length - 32.475 km)

I.r.q.p. work of manika (nh 75) to herhanj via matlong road (total length - 32.475 km)

Read more
Repair/ replacement of internal point wiring, sub-main point wiring main panel and lt cable of bungalows in upper line and chota rasta area (total 32 nos bungalows) gcf estate jabalpur.

Repair/ replacement of internal point wiring, sub-main point wiring main panel and lt cable of bungalows in upper line and chota rasta area (total 32 nos bungalows) gcf estate jabalpur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise