Tender Details

Particulars Details
Title
D And C Of Rcc R Walls And Preparation Of Subgrade Plc Of Gsb 200 Mm Thick Wmm 150 Mm Thick Dbm 75 Mm Thick Including Prime Coat And Bc 40 Mm Thick Including Tack Coat As Per Morth Specification Bet 0 To Km 7 On Ms Rd Under Project Dpk In Hp
Description
D And C Of Rcc R Walls And Preparation Of Subgrade Plc Of Gsb 200 Mm Thick Wmm 150 Mm Thick Dbm 75 Mm Thick Including Prime Coat And Bc 40 Mm Thick Including Tack Coat As Per Morth Specification Bet 0 To Km 7 On Ms Rd Under Project Dpk In Hp
Organisation Defence eProcurement Portal
Tender Id 2023_BRO_627047_1
Reference
Number
CE (P) DPK-08 of 2023-24
Tender Fee 0
EMD 7.71 Lakh
Tender Value -
Place Shimla
Link
View Original Tender Notice

https://defproc.gov.in

Start Date November 18, 2023 16:30
End Date
Expired 30/11/2023

Expired 1053 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
P and l of gsb 15 cm, wmm 10 cm, dbm 5 cm and bc 4 cm, prime, tack coat, road marking, road stud for rehab wks bet km 37.20 and km 46.91 on road ramsinghpur- kupli - dhandara - gharsana

P and l of gsb 15 cm, wmm 10 cm, dbm 5 cm and bc 4 cm, prime, tack coat, road marking, road stud for rehab wks bet km 37.20 and km 46.91 on road ramsinghpur- kupli - dhandara - gharsana

Read more
Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Read more
Recarpeting of b road in sector 6 ward no 2 mc panchkula by providing 30mm thick bc with tack coat leveling course with dbm

Recarpeting of b road in sector 6 ward no 2 mc panchkula by providing 30mm thick bc with tack coat leveling course with dbm

Read more
Pdg lyg of wmm 75mm th in 2 lyrs wmm 100mm th dbm 50mm th and bc 30mm th by pav finisher cmpt clng of rd surface appln of primer coat and tack coat for surf wk bet 0 to km 6.740 on oz road under 74 rcc 24 brtf p psk in mizoram state

Pdg lyg of wmm 75mm th in 2 lyrs wmm 100mm th dbm 50mm th and bc 30mm th by pav finisher cmpt clng of rd surface appln of primer coat and tack coat for surf wk bet 0 to km 6.740 on oz road under 74 rcc 24 brtf p psk in mizoram state

Read more
Pdg lyg of wmm 75mm th in 2 lyrs wmm 100mm th dbm 50mm th and bc 30mm th by pav finisher cmpt clng of rd surface appln of primer coat and tack coat rd mark paint for surf wk bet km 0.00 to km 12.160 on tp road under 74 rcc 24 brtf p psk in miz state

Pdg lyg of wmm 75mm th in 2 lyrs wmm 100mm th dbm 50mm th and bc 30mm th by pav finisher cmpt clng of rd surface appln of primer coat and tack coat rd mark paint for surf wk bet km 0.00 to km 12.160 on tp road under 74 rcc 24 brtf p psk in miz state

Read more
Recarpeting of balance b and c road in sector 8,9,10 ward no 4 mc panchkula by providing 25mm thick bc with tack coat leveling course with dbm

Recarpeting of balance b and c road in sector 8,9,10 ward no 4 mc panchkula by providing 25mm thick bc with tack coat leveling course with dbm

Read more
Upgradation of link roads at rehmat lane 5a, 6a and 7a at housing colonyt lal bazar srinagar by way of wmm, 50mm thick bm and 25mm thick semi dense with seal coat.

Upgradation of link roads at rehmat lane 5a, 6a and 7a at housing colonyt lal bazar srinagar by way of wmm, 50mm thick bm and 25mm thick semi dense with seal coat.

Read more
Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state

Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state

Read more
Pdg and lyg of pav wks comprising earthwork filling wbm wmm and bituminous surf wks with dbm50 mm 65 mm bc30 mm, prime and tcoat in strchs as per partic specn bet km148.0 to km164.3 and km168.97 to km172.8 on ldp rd under 71 rcc 24 tf pro psk in miz

Pdg and lyg of pav wks comprising earthwork filling wbm wmm and bituminous surf wks with dbm50 mm 65 mm bc30 mm, prime and tcoat in strchs as per partic specn bet km148.0 to km164.3 and km168.97 to km172.8 on ldp rd under 71 rcc 24 tf pro psk in miz

Read more
P and l of 75 mm tk wmm each in two layers km 00 to km 3pt000 75 mm tk dbm and 40 mm tk bc for surf rd surface aply pc and tc and rd mrkng bet km 00 to km 2pt500 all as per particular morth specification on pong op hill rd

P and l of 75 mm tk wmm each in two layers km 00 to km 3pt000 75 mm tk dbm and 40 mm tk bc for surf rd surface aply pc and tc and rd mrkng bet km 00 to km 2pt500 all as per particular morth specification on pong op hill rd

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise