Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Interior Panelling Of Eco Shop In Checkpost Building At Muthanga Under Muthanga Forest Station In Muthanga Range
|
Description |
Interior Panelling Of Eco Shop In Checkpost Building At&Amp#X0d
Muthanga Under Muthanga Forest Station In Muthanga Range
|
Organisation | Forest Department | State Govt. and UT |
Tender Id | 2025_FD_768782_1 |
Reference Number |
W6-31982/2025 |
Tender Fee | 500 |
EMD | 3900 |
Tender Value | |
Place | Sulthan Bathery |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1253823 |
Start Date | June 10, 2025 23:30 |
End Date |
18/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreReconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreFour laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreConstruction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Construction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Read moreof your Industry type