Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Aden/Sklr Sub Division: Strengthening Of Rr Masonry Retaining Walls And Repairs To Eroded Bed Of Side Drains At Scattered Locations In Sklr Sbhr Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72916556 |
|
Reference Number |
02MYS24of10-01-24itemno3 |
| Tender Fee | 0 |
| EMD | 2.75 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72916556/viewNitPdf_4444009.pdf |
| Start Date | January 10, 2024 18:42 |
| End Date |
Expired
01/02/2024
Expired 985 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
8726 repair to culverts retaining walls drains, ms grill fencing and connected works in residential area at nstl visakhapatnam
8726 repair to culverts retaining walls drains, ms grill fencing and connected works in residential area at nstl visakhapatnam
Read moreEnvironmental protection works, comprising construction of a rr masonry retaining wall, earthen garland drain and barbed wire fencing for roida-c iron ore mines of badabil region in the district of kendujhar. (re-tender)
Environmental protection works, comprising construction of a rr masonry retaining wall, earthen garland drain and barbed wire fencing for roida-c iron ore mines of badabil region in the district of kendujhar. (re-tender)
Read moreCertain repair to security fencing , path, hard standing, retaining walls, drains, repair/cleaning of sewage line, manholes, septic tank, soakage well, filter beds, street lights and misc works at mil stn dharchula under ge pithoragarh
Ge/pgh/79 of 2026-27 (8822/pgh/e8)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreSklr-sbhr : renewal of unserviceable sleepers and rails on scattered locations
For complete deion and other details, please refer to tender
Read moreAden/sklr sub division:- raising of side drain walls to avoid rolling down of ballast in to drain, repairs to eroded bed and scoured base of existing drain walls, repairs to damaged side drains in sklr-sbhr section.
For complete deion and other details, please refer to tender
Read moreAden/sklr sub division:- raising of side drain walls to avoid rolling down of ballast in to drain, repairs to eroded bed and scoured base of existing drain walls, repairs to damaged side drains in has-sklr and sbhr-padil section.
For complete deion and other details, please refer to tender
Read moreSw-i - aden sklr section : supplying and replacing level crossing assemblies and improvements to roads at has-sklr section and sbhr-padil stations. sw-ii : has majn section:- improvements to cess of formation between has-sklr and sbhr-padil
For complete deion and other details, please refer to tender
Read moreSw-i : aden/sklr : safety works of track during pre-monsoon & during monsoon felling of trees, strengthening of pway and safety provisions in has-sklr and sbhr-padil sw-ii:- aden/sklr : safety works of track during pre-monsoon & during monsoon felling of trees, strengthening of pway and safety provisions in sklr-sbhr ghat section
For complete deion and other details, please refer to tender
Read moreof your Industry type