Tender Details

Particulars Details
Title
Construction Of V. R.B. At In Slope Of River Bank At Reruwa Pump Canal Including All Cost Of Material, (Excluding Cement) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Description
Construction Of V. R.B. At In Slope Of River Bank At Reruwa Pump Canal Including All Cost Of Material, (Excluding Cement) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 766
EMD 10000
Tender Value
Place Executive Engineer Minor lift canal division vns
Link

AAAAAAAAAA

Login to view
Start Date April 16, 2025 17:30
End Date

22/04/2025 ( 2 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete

Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india

Read more
Repairing of barge no-01 (old barge) at balua pump canal including all cost of material, (excluding m.s. plate) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Repairing of barge no-01 (old barge) at balua pump canal including all cost of material, (excluding m.s. plate) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Read more
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Construction of v. r.b. at in slope of river bank at reruwa pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Construction of v. r.b. at in slope of river bank at reruwa pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Read more
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl

Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl

Read more
Ktps-v-cam-transportation of material, tp, ms erw pipes, various scrap material, ash, coal, silt debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg.

Read more
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi

Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi

Read more
Shifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis

Shifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis

Read more
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)

Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise