Tender Details
Particulars | Details |
---|---|
Title |
Construction Of V. R.B. At In Slope Of River Bank At Reruwa Pump Canal Including All Cost Of Material, (Excluding Cement) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
|
Description |
Construction Of V. R.B. At In Slope Of River Bank At Reruwa Pump Canal Including All Cost Of Material, (Excluding Cement) Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By Engineer In Charge.
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 766 |
EMD | 10000 |
Tender Value | |
Place | Executive Engineer Minor lift canal division vns |
Link |
AAAAAAAAAA Login to view |
Start Date | April 16, 2025 17:30 |
End Date |
22/04/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Investigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreRepairing of barge no-01 (old barge) at balua pump canal including all cost of material, (excluding m.s. plate) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Repairing of barge no-01 (old barge) at balua pump canal including all cost of material, (excluding m.s. plate) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreConstruction of v. r.b. at in slope of river bank at reruwa pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Construction of v. r.b. at in slope of river bank at reruwa pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.
Read moreShifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Read moreKtps-v-cam-transportation of material, tp, ms erw pipes, various scrap material, ash, coal, silt debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg.
Read moreShifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Read moreShifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis
Shifting works of pipeline and other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis
Read moreStrenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed
Read moreLaying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)
Laying of interlocking tiles with kerb stone complete with all material labour, t and p (as per specification of boq)
Read moreof your Industry type