Tender Details

Particulars Details
Title
Strenthaning Of Main Canal By 1st Class Brick Lining Work From 0.050 Km. To 0.415 Km. At Sudav Pump Canal Including All Cost Of Material , (Excluding Cement And Brick ), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Depart
Description
Strenthaning Of Main Canal By 1st Class Brick Lining Work From 0.050 Km. To 0.415 Km. At Sudav Pump Canal Including All Cost Of Material , (Excluding Cement And Brick ), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Depart
Organisation Government of Uttar Pradesh
Tender Id 2023_UPIDM_844870_10
Reference
Number
09/EE/MLCD/VNS/2023-24
Tender Fee 766
EMD 18000
Tender Value
Place Executive Engineer Minor lift canal division vns
Link https://etender.up.nic.in
Start Date October 03, 2023 17:30
End Date

10/10/2023 ( Expired 608 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 1st class brick lining in main canal from km. 0.350 to 0.850 km. at korantadeeh pump canal

Construction of 1st class brick lining in main canal from km. 0.350 to 0.850 km. at korantadeeh pump canal

Read more
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,

1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material

Read more
Brick relaying work with new 1st class brick, new brick linning with new 1st class brick, cc on bed with glass strip, cement plaster with all cost of material including labour and tool and plant etc at gokulpur pump canal in district sitapur

Brick relaying work with 40 percent new 1st class brick from chainage (0.010 to 0.200) km new brick linning with 100 percent new 1st class brick from 0.200 km to 0.600 km cc on bed with glass strip from 0.00 km to 0.600 km cement plaster from 0.00 to

Read more
1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal in

1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal

Read more
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can

1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli

Read more
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of

1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of

Read more
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc

Read more
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e

Read more
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p

Read more
Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Strenthaning of main canal by stone boulder piching from 0.400 km to 0.564 km at dhankuwari pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise