Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Ky Ip Acp Plan 2024 25 Rectification On Vykilassery Distributorybetween Ch.0/150 Km To 0/300 Km General Civil Work
|
| Description |
Ky Ip Acp Plan 2024 25 Rectification On Vykilassery Distributory&Amp#X0d
Between Ch.0/150 Km To 0/300 Km General Civil Work&Amp#X0d
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_686817_1 |
|
Reference Number |
IRR/PI/TR/3679/2024_5_2_1/1 |
| Tender Fee | 745 |
| EMD | 8424 |
| Tender Value | - |
| Place | Vykilassery |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1068683 |
| Start Date | August 20, 2024 00:25 |
| End Date |
Expired
27/08/2024
Expired 779 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General kyip acp plan 2026 27 rectification work at rbmc in between ch 18 500 km to ch 19 500 km general civil work
General kyip acp plan 2026 27 rectification work at rbmc in between ch 18 500 km to ch 19 500 km general civil work
Read moreGeneral kyip acp plan 2026 27 replacement of river surplus gate valve at ch 3 820 km of rbmc general mechanical work
General kyip acp plan 2026 27 replacement of river surplus gate valve at ch 3 820 km of rbmc general mechanical work
Read moreGeneral kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work
General kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work
Read moreGeneral kyip acp np 2026 27 annual maintenance of garden at peruvannamuzhi dam general civil work
General kyip acp np 2026 27 annual maintenance of garden at peruvannamuzhi dam general civil work
Read moreGeneral-deposit work -2026-27-rectification of damaged tractor crossing slab and side wall of ch 0/960 to ch 0/966 km of kambrathchalla branch canal and construction of side protection wall in cada field channel of ch 0/367 to ch 0/388 km that off
Clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering plastering etc
Read moreGeneral iip crds 2025 26 rectification works to kanjirapilly branch canal between ch.0 000 km and 0 250 km -general civil work
General iip crds 2025 26 rectification works to kanjirapilly branch canal between ch.0 000 km and 0 250 km -general civil work
Read moreGeneral-gps ii 2026-27-modernisation of field channel-offtaking from tail end of nandankizhaya branch canal bet. ch 0/000km and ch.0/150 km.-general civil work
Cada rectification works
Read moreR/o rain damages on link road to village dhar in km 0/0 to 1/500 (sh p/l interlocking tile at rd 0/150 to 0/160, 0/300 to 0/330 and 0/600 to 0/610). 2nd call
R/o rain damages on link road to village dhar in km 0/0 to 1/500 (sh p/l interlocking tile at rd 0/150 to 0/160, 0/300 to 0/330 and 0/600 to 0/610). 2nd call
Read more1) tenofovir 300 mg+lamivudine 300 mg+dolutegravir 50 mg tab, 2) stavudine 30 mg + lamivudine 150 mg tab, 3) atazanavir 300 mg + ritonavir 100 mg tab / cap, 4) zidovudine 300 mg + lamivudine 150 mg tab & 5) zidovudine 300 mg lamivudine 150 mg nevirapine 200 mg oral tablet
1) tenofovir 300 mg+lamivudine 300 mg+dolutegravir 50 mg tab, 2) stavudine 30 mg + lamivudine 150 mg tab, 3) atazanavir 300 mg + ritonavir 100 mg tab / cap, 4) zidovudine 300 mg + lamivudine 150 mg tab & 5) zidovudine 300 mg lamivudine 150 mg nevirapine 200 mg oral tablet
Read moreof your Industry type