Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Appointment Of Safety Consultant For Development And Construction Period For Bamni To Mh Tg Border Design Length 32.985 Km Section Of Nh 930 D In The State Of Maharashtra On Ham Mode Under Nho Consultancy Package No Schamnh 930 D2023 24 Nag 1
|
| Description |
Appointment Of Safety Consultant For Development And Construction Period For Bamni To Mh Tg Border Design Length 32.985 Km Section Of Nh 930 D In The State Of Maharashtra On Ham Mode Under Nho Consultancy Package No Schamnh 930 D2023 24 Nag 1
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_174813_1 |
|
Reference Number |
NHAI/RO-NAG/TENDERS/2023-24/22 |
| Tender Fee | 5000 |
| EMD | 25000 |
| Tender Value | |
| Place | NHAI RO Nagpur |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | November 17, 2023 21:30 |
| End Date |
Expired
14/12/2023
Expired 924 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreIe services for 4 laning of existing 2lane stretch from bamni (design km 19.000) to mh/tg border (design km 51.985) design length 32.985 km section of nh930d in maharashtra on ham
Ie services for 4 laning of existing 2lane stretch from bamni (design km 19.000) to mh/tg border (design km 51.985) design length 32.985 km section of nh930d in maharashtra on ham
Read moreSafety consultant for construction period for 4 laning of bodhre-dhule section from km 390 km 457.231 of nh-52 (design length - 67.231 km) in the state of maharashtra under bharatmala pariyojana on hybrid annuity mode
Safety consultant for construction period for 4 laning of bodhre-dhule section from km 390 km 457.231 of nh-52 (design length - 67.231 km) in the state of maharashtra under bharatmala pariyojana on hybrid annuity mode
Read moreAppointment of safety consultant for 6-laning of mandi dabwali (punjab/ haryana border) from km ch. 27.400 to km ch. 62.200 of nh-54 (length 34.800) in the state of haryana on ham
Appointment of safety consultant for 6-laning of mandi dabwali (punjab/ haryana border) from km ch. 27.400 to km ch. 62.200 of nh-54 (length 34.800) in the state of haryana on ham
Read moreAppointment of safety consultant for 4-laning of bhiwani - hansi road section of nh 148b (design length 42.934 km) and greenfield jalbehra - shahbad section of nh-152g from km 0.000 to km 22.850 in the state of haryana on hybrid annuity mode
Appointment of safety consultant for 4-laning of bhiwani - hansi road section of nh 148b (design length 42.934 km) and greenfield jalbehra - shahbad section of nh-152g from km 0.000 to km 22.850 in the state of haryana on hybrid annuity mode
Read moreof your Industry type