Tender Details
Particulars | Details |
---|---|
Title |
Annual Maintenance Of Track From Km: 0/300 78/000 Between Stations Mej To Ten Up Line, Dn Line And Ten To Kky Single Line In Sse/Pway/Ten Section For A Period Of One Year.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78426637 |
Reference Number |
MDU-W-27-2024-02 |
Tender Fee | 0 |
EMD | 2.15 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78426637/viewNitPdf_4770947.pdf |
Start Date | November 18, 2024 22:53 |
End Date |
12/12/2024 ( Expired 153 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract pbmc of wadigodri to jalna km 0 000 to 50 264 and ambad chowk to mantha chowk km 0 000 to km 5 243 section of nh 753h project length 55 507 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contract pbmc of wadigodri to jalna km 0 000 to 50 264 and ambad chowk to mantha chowk km 0 000 to km 5 243 section of nh 753h project length 55 507 km in the state of maharashtra for 5 year maintenance period
Read moreOne year annual maintenance to nh-161 to honwadaj jambhali yeoti vasur makni fata ambulga itgyal gonegaon gojegaon fata nh-63 road sh-410 km 0/00 to 31/500 (actual km. 0/00 to 4/600, 4/950 to 10/500, 11/500 to 26/150, 26/450 to 31/500) tq. mukhed dis
One year annual maintenance to nh-161 to honwadaj jambhali yeoti vasur makni fata ambulga itgyal gonegaon gojegaon fata nh-63 road sh-410 km 0/00 to 31/500 (actual km. 0/00 to 4/600, 4/950 to 10/500, 11/500 to 26/150, 26/450 to 31/500) tq. mukhed dis
Read morePeriodical maintenance on pali anupali road km. 0/00 to 5/00 (sh providing and laying 25mm thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km. 0/00 to 5/00 (sh providing and laying 25mm thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read morePeriodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read moreGeneral rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road
General rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road
Read moreGeneral rm 2024 25 rc 2 ph 2 zone 7 having 8.300 km road length one year running contract for various 4 road stretches under ezhukone roads section in kollam kottarakkara shasthamcotta road 8 400 to 12 400,oyoor koattadimukku road 0 000 to 1 250,po
General rm 2024 25 rc 2 ph 2 zone 7 having 8.300 km road length one year running contract for various 4 road stretches under ezhukone roads section in kollam kottarakkara shasthamcotta road 8 400 to 12 400,oyoor koattadimukku road 0 000 to 1 250,po
Read moreGeneral rm 2024 25 rc2 phase 2 zone 6 one year running contract for various pwd roads under roads section karunagappally in kollam district 4 road stretches for a length of 10.55 km kuttippuram malumel road ch.0 000 to 2 000, padanayarkulangara kar
General rm 2024 25 rc2 phase 2 zone 6 one year running contract for various pwd roads under roads section karunagappally in kollam district 4 road stretches for a length of 10.55 km kuttippuram malumel road ch.0 000 to 2 000, padanayarkulangara kar
Read moreShifting of electrical utility (11 kv ht pole and line ) for construction of berhampur ring road from 0/000 km to 12/300 km
Shifting of electrical utility (11 kv ht pole and line ) for construction of berhampur ring road from 0/000 km to 12/300 km under state plan for year 2023-24.
Read moreAnnual maintenance and repair of ms/ci/di rainey well pipe line for 2 years from mandawali rainey well upto anvt water tank complex (3.20 km) including maintenance of interconnection line from akshardham rainey well to mandawali rainey well (1.30 km) and desilting of mandawali rainey well to improve the water yield as per required schedule in the s/0 sse/w/anvt under aden/ndls
For complete deion and other details, please refer to tender
Read moreThrough rail renewal (primary) for 11.354 km. from km. 293.162 - km. 400.302 (in patches) on dn. line and complete track renewal (secondary) on loop lines of various yards for 5.557 km. between malligura - kirandul stations under the jurisdiction of sr.den (west)/wat on kk- ii line of waltair division.
For complete deion and other details, please refer to tender
Read moreof your Industry type