Tender Details
Particulars | Details |
---|---|
Title |
Annual Maintenance Of Track From Km: 0/300 78/000 Between Stations Mej To Ten Up Line, Dn Line And Ten To Kky Single Line In Sse/Pway/Ten Section For A Period Of One Year.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78426637 |
Reference Number |
MDU-W-27-2024-02 |
Tender Fee | 0 |
EMD | 2.15 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78426637/viewNitPdf_4770947.pdf |
Start Date | November 18, 2024 22:53 |
End Date |
12/12/2024 ( Expired 178 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read morePeriodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read moreDeposit dist panchayath 2025 2026 cpp kkps annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of kunnamkattupathy main canal and its branch canals for the year 2025 26 general civil work general civil work deposit dist panc
Deposit dist panchayath 2025 2026 cpp kkps annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of kunnamkattupathy main canal and its branch canals for the year 2025 26 general civil work general civil work deposit dist panc
Read morePerformance based maintenance contract pbmc of wadigodri to jalna km 0 000 to 50 264 and ambad chowk to mantha chowk km 0 000 to km 5 243 section of nh 753h project length 55 507 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contract pbmc of wadigodri to jalna km 0 000 to 50 264 and ambad chowk to mantha chowk km 0 000 to km 5 243 section of nh 753h project length 55 507 km in the state of maharashtra for 5 year maintenance period
Read moreOne year annual maintenance to nh-161 to honwadaj jambhali yeoti vasur makni fata ambulga itgyal gonegaon gojegaon fata nh-63 road sh-410 km 0/00 to 31/500 (actual km. 0/00 to 4/600, 4/950 to 10/500, 11/500 to 26/150, 26/450 to 31/500) tq. mukhed dis
One year annual maintenance to nh-161 to honwadaj jambhali yeoti vasur makni fata ambulga itgyal gonegaon gojegaon fata nh-63 road sh-410 km 0/00 to 31/500 (actual km. 0/00 to 4/600, 4/950 to 10/500, 11/500 to 26/150, 26/450 to 31/500) tq. mukhed dis
Read morePeriodical maintenance on pali anupali road km. 0/00 to 5/00 (sh providing and laying 25mm thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km. 0/00 to 5/00 (sh providing and laying 25mm thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read morePeriodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read moreGeneral rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road
General rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road
Read moreGeneral rm 2024 25 rc 2 ph 2 zone 7 having 8.300 km road length one year running contract for various 4 road stretches under ezhukone roads section in kollam kottarakkara shasthamcotta road 8 400 to 12 400,oyoor koattadimukku road 0 000 to 1 250,po
General rm 2024 25 rc 2 ph 2 zone 7 having 8.300 km road length one year running contract for various 4 road stretches under ezhukone roads section in kollam kottarakkara shasthamcotta road 8 400 to 12 400,oyoor koattadimukku road 0 000 to 1 250,po
Read moreof your Industry type