Tender Details

Particulars Details
Title
Supplying And Making Of Cable End Termination And Earthing At 10 No. Substation And En M Workshop Of Sarubera Project Under Kuju Area.
Description
Supplying And Making Of Cable End Termination And Earthing At 10 No. Substation And En M Workshop Of Sarubera Project Under Kuju Area.
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_285404_1
Reference
Number
GM (K)/EnM/eTender/23-24/76
Tender Fee -
EMD 2600
Tender Value -
Place GM UNIT KUJU
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date August 08, 2023 16:30
End Date
Expired 17/08/2023

Expired 1157 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
A) maintenance of 11 kv/3.3 kv/440 v ohl for period of 01 year at topa project under kuju area.b) illumination at excavation and enm workshop, settling tank pump station with aerial bunch cable, sky netting arrangements at topa project kuju area.

A) maintenance of 11 kv/3.3 kv/440 v ohl for period of 01 year at topa project under kuju area.b) illumination at excavation and enm workshop, settling tank pump station with aerial bunch cable, sky netting arrangements at topa project kuju area.

Read more
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable

Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable

Read more
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable

Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable

Read more
Supply and installation new chemical earthing with chamber pit and hardware,supply and installation new copper plate earthing with chamber pit for colony and hardware,earthing treatment for the solar plant with hardware,11 kv pole painting including cross arms and structures,33 kv pole painting including cross arms and structures,painting 33 kv substation with all equipment instrument transformers supports etc,lightning arrester copper supply with earthing installation for colony,gi flat 25 3 mm supply with installation,installation of lv ms cable tray channel with stand on lv side of transformers at solar plant,transformers painting of solar plant,ht cable termination kit joint charges,supply of 33 kv 3 core 185 sqmm cable kit outdoor termination,supply of 33 kv 3 core 185 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit outdoor termination,a supply of 11 kv 3 core 70 sqmm ug cable kit outdoor termination,b supply of 11 k

Supply and installation new chemical earthing with chamber pit and hardware,supply and installation new copper plate earthing with chamber pit for colony and hardware,earthing treatment for the solar plant with hardware,11 kv pole painting including cross arms and structures,33 kv pole painting including cross arms and structures,painting 33 kv substation with all equipment instrument transformers supports etc,lightning arrester copper supply with earthing installation for colony,gi flat 25 3 mm supply with installation,installation of lv ms cable tray channel with stand on lv side of transformers at solar plant,transformers painting of solar plant,ht cable termination kit joint charges,supply of 33 kv 3 core 185 sqmm cable kit outdoor termination,supply of 33 kv 3 core 185 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit outdoor termination,a supply of 11 kv 3 core 70 sqmm ug cable kit outdoor termination,b supply of 11 k

Read more
Replacement of existing rolling shutter at e and m workshop, making partition at e and m store, removing and relaying of stone aggregate at same site of 3.3 kv substation premises and other civil works at socm under bssa.

Replacement of existing rolling shutter at e and m workshop, making partition at e and m store, removing and relaying of stone aggregate at same site of 3.3 kv substation premises and other civil works at socm under bssa.

Read more
Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,sitc of free standing, outdoor cubicle type microprocessor based amf panel for 30 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 1.5sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supply and fixing the steel wire reinforced flexible upvc conduit,supplying and fixing of spn db,supplying and fixing of medium class pvc conduit,replacement of 12v, stop solenoid,replacement of 24v, stop solenoid,llop sensor,hct hwt sensor,sensor float,start stop relay,12 v or 24v oen pla relay,sf 40 mm dia gi pipe,dismantl

Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,sitc of free standing, outdoor cubicle type microprocessor based amf panel for 30 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 1.5sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supply and fixing the steel wire reinforced flexible upvc conduit,supplying and fixing of spn db,supplying and fixing of medium class pvc conduit,replacement of 12v, stop solenoid,replacement of 24v, stop solenoid,llop sensor,hct hwt sensor,sensor float,start stop relay,12 v or 24v oen pla relay,sf 40 mm dia gi pipe,dismantl

Read more
08 nos interlocking arrangement at 10 no., enm workshop and colony substation under sarubera project kuju area.

08 nos interlocking arrangement at 10 no., enm workshop and colony substation under sarubera project kuju area.

Read more
Installation and erection of interlocking arrangement in 11kv vcb at 10 no. substation. workshop substation, and colony substation of sarubera project under kuju area

Installation and erection of interlocking arrangement in 11kv vcb at 10 no. substation. workshop substation, and colony substation of sarubera project under kuju area

Read more
Click Here to Download Dockets