Tender Details

Particulars Details
Title
Construction Of Balance 27.70 M Length Compound Wall For The Work Of Construction Of 15 Mig Flats In Pudukkottai District Under Sfs Phase Ii As Per Revised Site Plan
Description
Construction Of Balance 27.70 M Length Compound Wall For The Work Of Construction Of 15 Mig Flats In Pudukkottai District Under Sfs Phase Ii As Per Revised Site Plan
Organisation Government of Tamil Nadu
Tender Id 2023_TNHB_356109_2
Reference
Number
EE.THU/02/2023-2024
Tender Fee 0
EMD 3940
Tender Value -
Place Trichy Housing Unit
Link
View Original Tender Notice

https://tntenders.gov.in

Start Date August 25, 2023 17:30
End Date
Expired 31/08/2023

Expired 1142 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Re-revised dnit for the balance work of providing improved access to water through house connections in water supply schemes of nandpur kesho, majri akalian, kalwa block and distt. patiala for repair of pump chamber, ohsr, water works site, p/f chlor

Re-revised dnit for the balance work of providing improved access to water through house connections in water supply schemes of nandpur kesho, majri akalian, kalwa block and distt. patiala for repair of pump chamber, ohsr, water works site, p/f chlor

Read more
Piping copper alloy annealed round seamless 12 303 kgf cm2 1,piping copper alloy round seamless solid drawn ext dia 12 8 mm,tube copper 5 8 id80wdg,piping copper round seamless solid drawn ext dia 0 99 wpt,copper rod rd 20 mm,rod copper rd dia 63 mm,rod coppwer rd dia 50 mm,welding electrode 48xn4 3 15mm dia 350mm length,welding electrode 48xn4 4 0mm dia 450mm length,electrode welding for dmr 249 a steel fcaw 1 2mm,hydrophobic compound,nb rod rd size 40mm,nb rod hex x 31 5 mm across flats,solid teflon ros 20 mm x 300 mm,solid teflon rod 25mm x 300 mm,solid teflon rod 40mm x 300 mm,solid teflon rod 60mm x 300 mm,solid teflon rod 87mm x 300 mm,welding electrode 48 x n4 2 5mm dia 300 mm length,steel bar carbon hot rolled,steel bar mild flat 25mm x 3 2mm,steel bar mild flat 25mm x 5mm,bar steel 1 x1 4,steel bar low carbon hot rolled flat ms dia 80mm x 6mm,steel sheet mild black tt 2500x1200x1 6m,angle equal ms size 25x25x3mm,angle equal ms 65x 65x 10 mm,ms angle 3 x3 x3 8 75x75x10mm,angle equal ms 90x90x8mm,ms an

Piping copper alloy annealed round seamless 12 303 kgf cm2 1,piping copper alloy round seamless solid drawn ext dia 12 8 mm,tube copper 5 8 id80wdg,piping copper round seamless solid drawn ext dia 0 99 wpt,copper rod rd 20 mm,rod copper rd dia 63 mm,rod coppwer rd dia 50 mm,welding electrode 48xn4 3 15mm dia 350mm length,welding electrode 48xn4 4 0mm dia 450mm length,electrode welding for dmr 249 a steel fcaw 1 2mm,hydrophobic compound,nb rod rd size 40mm,nb rod hex x 31 5 mm across flats,solid teflon ros 20 mm x 300 mm,solid teflon rod 25mm x 300 mm,solid teflon rod 40mm x 300 mm,solid teflon rod 60mm x 300 mm,solid teflon rod 87mm x 300 mm,welding electrode 48 x n4 2 5mm dia 300 mm length,steel bar carbon hot rolled,steel bar mild flat 25mm x 3 2mm,steel bar mild flat 25mm x 5mm,bar steel 1 x1 4,steel bar low carbon hot rolled flat ms dia 80mm x 6mm,steel sheet mild black tt 2500x1200x1 6m,angle equal ms size 25x25x3mm,angle equal ms 65x 65x 10 mm,ms angle 3 x3 x3 8 75x75x10mm,angle equal ms 90x90x8mm,ms an

Read more
Construction of balance 27.70 m length compound wall for the work of construction of 15 mig flats in pudukkottai district under sfs phase ii as per revised site plan

Construction of balance 27.70 m length compound wall for the work of construction of 15 mig flats in pudukkottai district under sfs phase ii as per revised site plan

Read more
Construction of compound walling at new site of phc sakti (balance work) (under capex)

Construction of compound walling at new site of phc sakti (balance work) (under capex)

Read more
Construction of balance compound wall and culverts for p-1185 at rr site, kota, rajasthan.

Construction of balance compound wall and culverts for p-1185 at rr site, kota, rajasthan.

Read more
Construction of balance roads along with reserved site for ms flats in sector-77, s.a.s. nagar (civil works and public health works)

Construction of balance roads along with reserved site for ms flats in sector-77, s.a.s. nagar (civil works and public health works)

Read more
Balance compound wall and allied site development work at ahmadnagar sub-centre baburdi ghumat of savitribai phule, pune university at ahmednagar. (second call)

Providing shuttering rcc pardi column work tmt fe 500 rcc coping footing gate work trimix work and allied civil work

Read more
Mo services under n ac ii rohini 1. mo mp green area at sector 28 rohini part ii between lig mig flats 2. mo park at pocket c 4 at sector 28 rohini. sh annual job contract for the complete maintenance of park for 12 months at site.

Mo services under n ac ii rohini 1. mo mp green area at sector 28 rohini part ii between lig mig flats 2. mo park at pocket c 4 at sector 28 rohini. sh annual job contract for the complete maintenance of park for 12 months at site.

Read more
Laying of cc road in various colonies of ward no 1 (compound wall work closed in ward no 1 with an rs.33.61 lakhs. due to site not available balance amount will be used to cc road work) in nizampet municipal corporation under municipal general funds 2024-

Laying of cc road in various colonies of ward no 1 (compound wall work closed in ward no 1 with an rs.33.61 lakhs. due to site not available balance amount will be used to cc road work) in nizampet municipal corporation under municipal general funds 2024-

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise