Mtps I Mill Plant Unit Iv Dismantling And Assembling Of Fuel Inlet Elbows And Hard Facing Of Fuel Inlet Elbows Long And Short During Annual Overhaul 2024 25
|
Description |
Mtps I Mill Plant Unit Iv Dismantling And Assembling Of Fuel Inlet Elbows And Hard Facing Of Fuel Inlet Elbows Long And Short During Annual Overhaul 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_462373_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.86 / 2024-25 |
Tender Fee | 0 |
EMD | 4400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=549515 |
Start Date | July 12, 2024 18:30 |
End Date |
18/07/2024 ( Expired 299 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreSealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreMtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26
Mtpsi mill plant unit i dismantling and assembling of fuel inlet elbows and hard facing of fuel inlet elbows long and short during annual overhaul 2025 26
Read moreMtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreMtps i bm unit i boiler pressure parts aoh 2025 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Mtps i bm unit i boiler pressure parts aoh 2025 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Read moreMtps i bm unit i boiler pressure parts aoh 2025 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate
Mtps i bm unit i boiler pressure parts aoh 2025 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i bm unit i rotating parts annual maintenance 2025 26 removal and renewal of insulation in fg ducts air ducts and air pre heaters
Mtps i bm unit i rotating parts annual maintenance 2025 26 removal and renewal of insulation in fg ducts air ducts and air pre heaters