Tender Details

Particulars Details
Title
Mtpsi Mill Plant Unit I Dismantling And Assembling Of Fuel Inlet Elbows And Hard Facing Of Fuel Inlet Elbows Long And Short During Annual Overhaul 2025 26
Description
Mtpsi Mill Plant Unit I Dismantling And Assembling Of Fuel Inlet Elbows And Hard Facing Of Fuel Inlet Elbows Long And Short During Annual Overhaul 2025 26
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_555919_1
Reference
Number
CE / MTPS-I / SE / M-I / MP /OT.74/ 2025-26
Tender Fee 0
EMD 8400
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=664054
Start Date May 12, 2025 14:30
End Date

26/05/2025 ( Expired 11 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ca no ge(n)amb-15/2025-26 repair to fencing, compound wall, hard standing, drain and other allied works in otm accn area i, ii, iii of age b/r-ii under ge (north) ambala cantt

Ca no ge(n)amb-15/2025-26 repair to fencing, compound wall, hard standing, drain and other allied works &#x0d in otm accn area i, ii, iii of age b/r-ii under ge (north) ambala cantt

Read more
Annual mtc. of govt. office building of teliamura sub-division no. i, teliamura sub-division no. ii, kalyanpur sub-divisoin and mungiakami sub division, pwd(randb) and govt. residencial quarter within teliamura pwd complex during the year 2025-26.

Annual mtc. of govt. office building of teliamura sub-division no. i, teliamura sub-division no. ii, kalyanpur sub-divisoin and mungiakami sub division, pwd(randb) and govt. residencial quarter within teliamura pwd complex during the year 2025-26.

Read more
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Read more
Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)

Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)

Read more
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)

Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)

Read more
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Read more
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass

Read more
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26

Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26

Read more
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26

Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26

Read more
Fdr mtc of existing pucca irrigation channels of li scheme at dalak i of west dalak gp under amarpur rd block sh dismantling brickwork plastering and other allied works etc during the year 2025 26

Fdr mtc of existing pucca irrigation channels of li scheme at dalak i of west dalak gp under amarpur rd block sh dismantling brickwork plastering and other allied works etc during the year 2025 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise