Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rampura Kala Jalkuwa Approach Road Length 4.40 Km. Ic Shifting Of Ht Lt Lines Pole And Transformer Creating Obstacles In Const
|
Description |
Construction Of Rampura Kala Jalkuwa Approach Road Length 4.40 Km. Ic Shifting Of Ht Lt Lines Pole And Transformer Creating Obstacles In Const
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id | 2024_PWDRB_336043_1 |
Reference Number |
NIT.21/SAC/Dated 20-02-2024 |
Tender Fee | 16534 |
EMD | 3.71 Lakh |
Tender Value | |
Place | Khandwa |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=395082 |
Start Date | February 23, 2024 16:00 |
End Date |
04/03/2024 ( Expired 440 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreof your Industry type