Tender Details
Particulars | Details |
---|---|
Title |
Rectification Work Of3 Wss Under Package 3 To Nedumkandam Grama Panchayath Idukki District
|
Description |
Rectification Work Of3 Wss Under Package 3 To Nedumkandam Grama Panchayath Idukki District
|
Organisation | Kerala Rural Water Supply and Sanitation Agency | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2500 |
EMD | 36000 |
Tender Value | |
Place | Nedumkandam GramaPanchayath |
Link |
AAAAAAAAAA Login to view |
Start Date | May 19, 2025 16:30 |
End Date |
09/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreConstruction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.
Construction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreBiennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Read moreArea development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)
Area development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)
Read moreDrain construction work from raees mithai to kalandar hotel under division no. 16 sanjay gandhi ward.
Drain construction work from raees mithai to kalandar hotel under division no. 16 sanjay gandhi ward.
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreRound the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,
Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling
Read moreof your Industry type