Tender Details

Particulars Details
Title
Rectification Work Of3 Wss Under Package 3 To Nedumkandam Grama Panchayath Idukki District
Description
Rectification Work Of3 Wss Under Package 3 To Nedumkandam Grama Panchayath Idukki District
Organisation Kerala Rural Water Supply and Sanitation Agency | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2500
EMD 36000
Tender Value
Place Nedumkandam GramaPanchayath
Link

AAAAAAAAAA

Login to view
Start Date May 19, 2025 16:30
End Date

09/06/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Construction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.

Construction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps

Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps

Read more
Area development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)

Area development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)

Read more
Drain construction work from raees mithai to kalandar hotel under division no. 16 sanjay gandhi ward.

Drain construction work from raees mithai to kalandar hotel under division no. 16 sanjay gandhi ward.

Read more
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Read more
Round the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,

Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise