Tender Details

Particulars Details
Title
Security Wall Construction Work On Both Sides Of Nirjhara Mahadev Temple Road, Dangarwara Khurdh
Description
Security Wall Construction Work On Both Sides Of Nirjhara Mahadev Temple Road Dangarwara Khurdh
Organisation Government of Rajasthan
Tender Id 2023_PRD_364696_3
Reference
Number
1565-1574 Date 08/09/2023
Tender Fee 500
EMD 20000
Tender Value
Place PS Jamwaramgah
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in

Start Date September 08, 2023 23:30
End Date
Expired 15/09/2023

Expired 1044 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Patch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa

Patch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Cc road work on in ward no.-126 both sides of sector-11/837 park, on both sides of sector-12 jhulelal temple, and in 3/650 gandhigrah lane

Cc road work on in ward no.-126 both sides of sector-11/837 park, on both sides of sector-12 jhulelal temple, and in 3/650 gandhigrah lane

Read more
Construction of r wall both sides on nallah yechkhan at d.g.gund.

Construction of r wall both sides on nallah yechkhan at d.g.gund.

Read more
Construction of r wall both sides on nallah yechkhan at d.g.gund.

Construction of r wall both sides on nallah yechkhan at d.g.gund.

Read more
Construction of lining wall on both sides of brental ladi at batkoot.

Construction of lining wall on both sides of brental ladi at batkoot.

Read more
Construction of lining wall on both sides of drought pump at herpora

Construction of lining wall on both sides of drought pump at herpora

Read more
Construction of lining wall on both sides of drought pump at herpora

Construction of lining wall on both sides of drought pump at herpora

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise