Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing And Maintenance Of Platform Structure Of 03 Nos Static Road Weighbridge Of Socp, Ib Valley Area For A Period Of One Year.
|
| Description |
Repairing And Maintenance Of Platform Structure Of 03 Nos Static Road Weighbridge Of Socp, Ib Valley Area For A Period Of One Year.
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_MCL_332882_1 |
|
Reference Number |
MCL/GM/IBV/ENM/etender/112230 Dated.18.03.2025 |
| Tender Fee | 0 |
| EMD | 7800 |
| Tender Value | - |
| Place | SOCP, IB Valley Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345071 |
| Start Date | March 19, 2025 15:30 |
| End Date |
Expired
02/04/2025
Expired 558 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of contract for photocopying work at gms office, mm area for a period of three (03) years.
Award of contract for photocopying work at gms office, mm area for a period of three (03) years.
Read moreConstruction of water harvesting structure at various locations in ganesh nagar -284 and padma nagar-285, jeedimetla circle-55,quthbullapur zone, cmc. (reserved for waddara / sagara) (item no.2) (completion period 1 month)
Construction of water harvesting structure at various locations in ganesh nagar -284 and padma nagar-285, jeedimetla circle-55,quthbullapur zone, cmc. (reserved for waddara / sagara) (item no.2) (completion period 1 month)
Read moreAward of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Award of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Read moreHiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreProviding of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.
Read moreRepairing and strengthening of platform structure of 06 nos. static road weighbridges of socp for a period of 01 year as on when required basis.
Repairing and strengthening of platform structure of 06 nos. static road weighbridges of socp for a period of 01 year as on when required basis.
Read moreConstruction of 03 nos. rcc approach, ramp and drain for 03 nos. new 100 te static weigh bridge at socp under ib valley area
Construction of 03 nos. rcc approach, ramp and drain for 03 nos. new 100 te static weigh bridge at socp under ib valley area
Read moreof your Industry type