Tender Details

Particulars Details
Title
Repairing Of Operator Cabin Assembly Of Bh60 M Dumper 60385, 60386, 60387, 60388 And 60392 Of Gvp Ph Ii Ocp.
Description
Repairing Of Operator Cabin Assembly Of Bh60 M Dumper 60385, 60386, 60387, 60388 And 60392 Of Gvp Ph Ii Ocp.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_316188_1
Reference
Number
P.E(X)/GVP Ph-II/24-25/E-TENDER/50 Dt.-29.08.2024
Tender Fee 0
EMD 3500
Tender Value
Place GVP PH-II OCP, KATHARA AREA.
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327678
Start Date August 30, 2024 23:30
End Date

12/09/2024 ( Expired 221 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sinking of (300x200x150) mtr and 150x150x150 mtr deapth tw ,construction of pump house and construction of toilet block at ph-ii,boundrary wall repairing ,laying distribution system and interconnection of pwss with detials route sourvey

Sinking of (300x200x150) mtr and 150x150x150 mtr deapth tw ,construction of pump house and construction of toilet block at ph-ii,boundrary wall repairing ,laying distribution system and interconnection of pwss with detials route sourvey

Read more
Repairing of ph-i and ph-ii track hopper floor, sgtpp/wbpdcl.

Repairing of ph-i and ph-ii track hopper floor, sgtpp/wbpdcl.

Read more
Repairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp

Repairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp

Read more
Repairing of transmission filter housing, spider assembly, flanges, equalizer bar both sides and cover plates of transmission filter and steps of wd600-3 wheel dozer sl. no. 50454 of jharkhand ocp.

Repairing of transmission filter housing, spider assembly, flanges, equalizer bar both sides and cover plates of transmission filter and steps of wd600-3 wheel dozer sl. no. 50454 of jharkhand ocp.

Read more
(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g

(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g

Read more
Repairing/replacement of electrical wiring harness and corresponding electrical devices and steering system for bh60m dumper sl no. 60913.

Repairing/replacement of electrical wiring harness and corresponding electrical devices and steering system for bh60m dumper sl no. 60913.

Read more
Repairing of operator cabin, co operator cabin and changing of curtain with accessories of 24/96 krishna dragline working at nigahi project

Repairing of operator cabin, co operator cabin and changing of curtain with accessories of 24/96 krishna dragline working at nigahi project

Read more
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo

(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo

Read more
Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.

Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.

Read more
Maintenance work of ht line overhead line (11kv swg feeder, 11kv gvp ph-ii ocp feeder for monsoon preparation 2025 under gvp ph-ii ocp of kathara area

Maintenance work of ht line overhead line (11kv swg feeder, 11kv gvp ph-ii ocp feeder for monsoon preparation 2025 under gvp ph-ii ocp of kathara area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise