Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Hoist Control Valve Assembly Of Bh60 M Dumper, Sl. No. 60385, 60387 And 60392 Of Gvp Ph Ii Ocp.
|
Description |
Repairing Of Hoist Control Valve Assembly Of Bh60 M Dumper, Sl. No. 60385, 60387 And 60392 Of Gvp Ph Ii Ocp.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_323020_1 |
Reference Number |
P.E(X)/GVP Ph-II/E-TENDER/24-25/89 |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | GVP PH-II OCP, KATHARA AREA. |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334814 |
Start Date | December 10, 2024 15:30 |
End Date |
20/12/2024 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Spl repair to bldg no. t-197 and govt md accn no 165 at map ph-ii, pkt - vi of sujjan enclave at mil stn dharchula.
Spl repair to bldg no. t-197 and govt md accn no 165 at map ph-ii, pkt - vi of sujjan enclave at mil stn dharchula.
Read moreRepairing of ph-i and ph-ii track hopper floor, sgtpp/wbpdcl.
Repairing of ph-i and ph-ii track hopper floor, sgtpp/wbpdcl.
Read morePainting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Painting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Read moreProvn of single accn for officers alongwith central heating system (chs) in officers mess (ph-i and ph ii) under ge (i) (p) no. 1, leh
Provn of single accn for officers alongwith central heating system (chs) in officers mess (ph-i and ph ii) under ge (i) (p) no. 1, leh
Read moreRepairing / testing and transportation of the failed cummins make engine (esn 33182273), model-qsk-60 of beml make dumper sl. no. 99006 , model-bh205e from hhp rebuilt centre, pune to nigahi project, ncl
Repairing / testing and transportation of the failed cummins make engine (esn 33182273), model-qsk-60 of beml make dumper sl. no. 99006 , model-bh205e from hhp rebuilt centre, pune to nigahi project, ncl
Read moreRepairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp
Repairing and re-winding of 325kw, 3.3kv, make-marathan, h.t motor, sl.no.-3f330720/2 of gvp ph-ii ocp
Read more(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
(a). repairing of 3.3kv, 630a, vcb, ctr 600/300/5a, make-pce, sl.no.-05/hmv/132 installed at main sub-station of gvp phase-ii ocp, (b). repairing of 3.3kv vcb, make-pce, 630a, sl.no.-05/hmv/131 of secondary switch at 3mva, 11kv/3.3kv transformer of g
Read moreRepairing of dump body side wall extension part of cat789d 190t dumper sl. no. 1013 at new work shop , nigahi project
Repairing of dump body side wall extension part of cat789d 190t dumper sl. no. 1013 at new work shop , nigahi project
Read more(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
Read moreRepairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Repairing of plateform of digtal make 50te capacity, electronic road w/b installed at zero point and check post for monsoon preparation 2025 of gvp phase-ii ocp.
Read moreof your Industry type