Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4lane South East Bypass For Azamgarh City Connecting Nh 28 At Existing Ch. Km 218.800 To Purvanchal Expressway At Existing Ch. Km 247.850 (Total Length 14.905 Km) In Up On Epc Mode
|
| Description |
Construction Of 4lane South East Bypass For Azamgarh City Connecting Nh 28 At Existing Ch. Km 218.800 To Purvanchal Expressway At Existing Ch. Km 247.850 (Total Length 14.905 Km) In Up On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_250647_1 |
|
Reference Number |
UPDIV-21/10/ 2025-UP Division/E-294525 |
| Tender Fee | 60000 |
| EMD | 5.48 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=287557 |
| Start Date | September 27, 2025 00:00 |
| End Date |
Expired
13/11/2025
Expired 334 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab
Construction of 4lane gf amritsar-katra connectivity of amritsar with dak expressway from mdr junction at ch.40.900 dhunda village-junction nh3 and taran taran bypass near mannawalla village ch.70.950 (km 40.900-km 70.950 pkg-2) on epc mode in punjab
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreAuthority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Authority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreConstruction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Construction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Read moreConstruction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreDevelopment of interchange at starting point of ahmedabad dholera expressway meeting with sardar patel ring road sprr in ahmedabad gujarat on epc mode
Development of interchange at starting point of ahmedabad dholera expressway meeting with sardar patel ring road sprr in ahmedabad gujarat on epc mode.
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreof your Industry type